FAA Orders Inspections For Boeing 767 Pylons | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Fri, Jul 23, 2010

FAA Orders Inspections For Boeing 767 Pylons

Must Now Be Inspected After 8,000 Total Flights

The FAA is ordering U.S. operators of 138 Boeing 767 airplanes to reduce the initial pylon inspection time mandated in a September 22, 2005 AD from 10,000 to 8,000 total flights. This inspection must be done within 400 flights after the most recent inspection required by the 2005 directive, or within 90 days, whichever occurs later.

The FAA is also reducing the interval for repetitive inspections for cracking of the pylon midspar structural fittings and an adjacent structure from 1,500 to every 400 flights thereafter. There is also an option for replacing the fittings instead of conducting the inspections.

Since the 2005 Airworthiness Directive (AD), the FAA has received two reports of cracking of the midspar structural fitting on Boeing 767 pylons. The pylon attaches the engine to the wing. Undetected cracking could lead to fracture of the structural components, damage to the pylon, and separation of the engine from the wing.

The Immediately Adopted AD affects 138 U.S.-registered airplanes out of 314 worldwide. The total cost to U.S. operators is approximately $46,920. The AD affects only those 767 models that have the original pylon design. Boeing has improved the design of the 767 pylon and those aircraft with the improved pylon designs are not included in this AD.

FMI: www.ofr.gov/OFRUpload/OFRData/2010-17611_PI.pdf

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC