First Flight: E-2D Advanced Hawkeye With New Aerial Refueling Capability | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Tue, Dec 20, 2016

First Flight: E-2D Advanced Hawkeye With New Aerial Refueling Capability

Will Give Aircraft Greater Range, Extend Mission Times

Northrop Grumman has successfully completed the first flight of an E-2D Advanced Hawkeye equipped with aerial refueling (AR).

Under a 2013 engineering, manufacturing, and development (EMD) contract award, Northrop Grumman designed, developed, manufactured, and tested several sub-system upgrades necessary to accommodate an aerial refueling capability.

“The Northrop Grumman aerial refueling team continues to put outstanding effort into bringing this much-needed capability to the E-2D Advanced Hawkeye and our warfighters who rely on it,” said Capt. Keith Hash, program manager, E-2/C-2 Airborne Tactical Data System Program Office (PMA-231).

The aerial refueling capability will allow the E-2D to provide longer on-station times at greater ranges, extending its mission time to better support the warfighter.

The upgrades installed to support aerial refueling include probe and associated piping, electrical and lighting upgrades, and long endurance seats that will enhance field of view in the cockpit and reduce fatigue over longer missions.

“First flight is an exciting day in the journey from concept to an aerial refueling equipped E-2D,” said Jane Bishop, vice president, E-2/C-2 programs, Northrop Grumman. “This takes the E-2D to another level, which will bring more combat persistence to the U.S. and our allies.”

The aerial refueling program will modify three aircraft for testing planned through 2018. Production cut-in and retrofit plans are scheduled to begin in 2018.

(Images provided with Northrop Grumman news release)

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Linx (05.06.25)

Aero Linx: International Federation of Airworthiness (IFA) We aim to be the most internationally respected independent authority on the subject of Airworthiness. IFA uniquely combi>[...]

ANN's Daily Aero-Term (05.06.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: Virtual Reality Painting--PPG Leverages Technology for Training

From 2019 (YouTube Edition): Learning To Paint Without Getting Any On Your Hands PPG's Aerospace Coatings Academy is a tool designed to teach everything one needs to know about all>[...]

Airborne 05.02.25: Joby Crewed Milestone, Diamond Club, Canadian Pilot Insurance

Also: Sustainable Aircraft Test Put Aside, More Falcon 9 Ops, Wyoming ANG Rescue, Oreo Cookie Into Orbit Joby Aviation has reason to celebrate, recently completing its first full t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC