A400M Program Review Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-11.19.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Dec 04, 2006

A400M Program Review Completed

Electrical Harnesses May Pose Problems Ahead

Aero-News has learned the two month-review of the Airbus A400M program, mandated by the CEOs of European Aeronautic Defense and Space Co. (EADS) in September, was completed last week through presentations to Europe's Organisation Conjointe de Coopération en matière d'ARmement (OCCAR) and the Board of Directors at EADS.

Airbus reports that overall, the review validated that the A400M program is currently progressing according to the contractually agreed schedule. However, EADS states several "significant" challenges lie ahead before the first delivery of the military-spec turboprop transport in 2009.

Those risk areas include systems design, and in particular electrical harnesses; maturity of military mission systems; engine modifications; and remaining work to be done on the Final Assembly Line.

The European planemaker called the review the most comprehensive assessment ever done on an EADS development program. The review team -- which incorporated external experts and "veterans" from the A380 review of last summer -- conducted intensive program management and floor level interviews, industrial site visits and data analysis, capitalizing on reference data from the A380 and other programs as far as applicable.

The review team has proposed detailed mitigating actions to comply with the delivery schedule committed to customers. These actions were endorsed by the CEOs of EADS and the Board of Directors.

Implementation will be followed by EADS Co-CEOs Louis Gallois and Thomas Enders personally, on a bimonthly basis.

FMI: www.airbus.com

Advertisement

More News

NTSB Prelim: Cirrus Design Corp SR20

The Airplane Made An Uncommanded Right Yaw And Roll, And He Was Unable To Maintain Control Of The Airplane On November 11, 2025, about 1750 central standard time, a Cirrus SR20, N8>[...]

ANN's Daily Aero-Linx (11.30.25)

Aero Linx: Florida Antique Biplane Association "Biplanes.....outrageous fun since 1903." That quote really defines what the Florida Antique Biplane Association (FABA) is all about.>[...]

ANN's Daily Aero-Term (11.30.25): Wind Shear Escape

Wind Shear Escape An unplanned abortive maneuver initiated by the pilot in command (PIC) as a result of onboard cockpit systems. Wind shear escapes are characterized by maximum thr>[...]

Aero-News: Quote of the Day (11.30.25)

“Working closely with the Polish Armed Forces, we’re focused on disciplined execution to help enhance Poland’s defense capabilities and keep up with the strong de>[...]

Airborne 11.26.25: Bonanza-Baron Fini, Archer v LA NIMBYs, Gogo Loses$$$

Also: Bell 505 on SAF, NYPA Gets Flak For BizAv 'Abuse', FAA Venezuela Caution, Horizon Update Textron Aviation has confirmed it will be ending production of the Beechcraft Bonanza>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC