A400M Program Review Completed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.17.24

Airborne-NextGen-06.18.24

Airborne-Unlimited-06.12.24 Airborne-FltTraining-06.13.24

Airborne-Unlimited-06.14.24

Mon, Dec 04, 2006

A400M Program Review Completed

Electrical Harnesses May Pose Problems Ahead

Aero-News has learned the two month-review of the Airbus A400M program, mandated by the CEOs of European Aeronautic Defense and Space Co. (EADS) in September, was completed last week through presentations to Europe's Organisation Conjointe de Coopération en matière d'ARmement (OCCAR) and the Board of Directors at EADS.

Airbus reports that overall, the review validated that the A400M program is currently progressing according to the contractually agreed schedule. However, EADS states several "significant" challenges lie ahead before the first delivery of the military-spec turboprop transport in 2009.

Those risk areas include systems design, and in particular electrical harnesses; maturity of military mission systems; engine modifications; and remaining work to be done on the Final Assembly Line.

The European planemaker called the review the most comprehensive assessment ever done on an EADS development program. The review team -- which incorporated external experts and "veterans" from the A380 review of last summer -- conducted intensive program management and floor level interviews, industrial site visits and data analysis, capitalizing on reference data from the A380 and other programs as far as applicable.

The review team has proposed detailed mitigating actions to comply with the delivery schedule committed to customers. These actions were endorsed by the CEOs of EADS and the Board of Directors.

Implementation will be followed by EADS Co-CEOs Louis Gallois and Thomas Enders personally, on a bimonthly basis.

FMI: www.airbus.com

Advertisement

More News

ANN FAQ: Submit a News Story!

Have A Story That NEEDS To Be Featured On Aero-News? Here’s How To Submit A Story To Our Team Some of the greatest new stories ANN has ever covered have been submitted by our>[...]

Aero-News: Quote of the Day (06.12.24)

“The legislation now includes a task force with industry representation ensuring that we have a seat at the table and our voice will be heard as conversations about the futur>[...]

ANN's Daily Aero-Linx (06.12.24)

Aero Linx: Waco Museum The WACO Historical Society, in addition to preserving aviation's past, is also dedicated and actively works to nurture aviation's future through its Learnin>[...]

ANN's Daily Aero-Term (06.12.24): Adcock Range

Adcock Range National low-frequency radio navigation system (c.1930-c.1950) replaced by an omnirange (VOR) system. It consisted of four segmented quadrants broadcasting Morse Code >[...]

Airborne Affordable Flyers 06.06.24: 200th ALTO, Rotax SB, Risen 916iSV

Also: uAvionix AV-Link, Does Simming Make Better Pilots?, World Games, AMA National Fun Fly Czech sportplane manufacturer Direct Fly has finished delivering its 200th ALTO NG, the >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC