Air Force Proposes Initial JSF Locations | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Thu, Oct 05, 2006

Air Force Proposes Initial JSF Locations

Stateside Bases Include Active, Reserve Personnel

Officials with the US Air Force announced Thursday plans are underway for initiating environmental analyses for proposed locations of the Air Force's newest fighter, the F-35A Lightning II Joint Strike Fighter.

The initial Joint Strike Fighter locations include Eglin Air Force Base, FL for primary maintenance and flight training; Nellis AFB, NV and Edwards AFB, CA for flight-testing; and Hill AFB, UT, Kadena Air Base, Japan, and Shaw AFB/McEntire ANGB, SC for operational squadrons. Both stateside operational bases will combine active duty and Reserve Component personnel to maximize flexibility and combat capability.

"Our environmental analyses will facilitate our decision-making process as these locations are evaluated," said General T. Michael Moseley, Air Force Chief of Staff. "With this announcement, the Air Force will begin the environmental analysis process, which could take up to two years. Future environmental analyses will study traditional Air National Guard and Air Force Reserve bases along with a selection of Active Duty bases.

"The capabilities we provide the joint warfighter are in high demand, yet we have the oldest aircraft inventory in our history," said General Moseley. "The Air Force will continue to invest in advanced capabilities needed to defeat the emerging technological advances of our adversaries."

The Air Force states the F-35A Lightning II basing plan will create a synergistic "Total Force" mix of Active, Guard and Reserve units operating its newest 5th generation fighter aircraft. The Total Force mix provides the best possible team to deliver sovereign options for the defense of the United States in the war on terrorism.

The Air Force is expected to start taking delivery of F-35A aircraft in 2009 with planned deliveries continuing beyond 2025.

FMI: www.af.mil

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC