Van's Aircraft Issues Service Bulletin For RV-12/12iS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Fri, Feb 07, 2020

Van's Aircraft Issues Service Bulletin For RV-12/12iS

WD-1201 Nose Gear Leg Replacement Program Published

Flyer/builder/owners of Van's thrifty little RV-12 have a Service Bulletin to look over.

Van's noted that, "An RV-12 training aircraft with more than 1700 hours of accumulated flight time recently experienced a nose gear fatigue failure. This is the only reported instance; no other fatigue-related nose gear failures have been reported. The failure occurred in the nose gear leg at the point where the leg tube meets the lower attachment bracket, and was caused by a fatigue crack that propagated across the tube. The crack occurred at a location that is not visually inspectable. It is, therefore, strongly recommended that owners of RV-12/RV-12iS aircraft with the original style nose gear leg (WD-1201) replace that part with the available updated, reinforced leg - part number WD-1201-1."

The SB applies only to original WD-1201 legs, which were shipped prior to June 10th, 2019. If you have received a WD-1201-1 gear leg since that time either with your kit or as a backorder item, it is not affected. They add that, "...In addition, only if your RV-12 or RV-12iS is currently under construction, and you received your finishing kit prior to June 10, 2019, and you have not yet completed the following steps in your plans, please contact Van’s Aircraft to order a replacement gear leg rather than ordering the retrofit."

FMI: www.vansaircraft.com/wp-content/uploads/2020/01/SB-19-08-26-Nose-Gear-Replacement.pdf

Advertisement

More News

ANN's Daily Aero-Term (05.05.24): Omnidirectional Approach Lighting System

Omnidirectional Approach Lighting System ODALS consists of seven omnidirectional flashing lights located in the approach area of a nonprecision runway. Five lights are located on t>[...]

Aero-News: Quote of the Day (05.05.24)

"Polaris Dawn, the first of the program’s three human spaceflight missions, is targeted to launch to orbit no earlier than summer 2024. During the five-day mission, the crew >[...]

Airborne 05.06.24: Gone West-Dick Rutan, ICON BK Update, SpaceX EVA Suit

Also: 1800th E-Jet, Uncle Sam Sues For Landing Gear, Embraer Ag Plane, Textron Parts A friend of the family reported that Lt. Col. (Ret.) Richard Glenn Rutan flew west on Friday, M>[...]

Airborne 05.03.24: Advanced Powerplant Solutions, PRA Runway Woes, Drone Racing

Also: Virgin Galactic, B-29 Doc to Allentown, Erickson Fire-Fighters Bought, FAA Reauthorization After dealing with a big letdown after the unexpected decision by Skyreach to disco>[...]

Aero-News: Quote of the Day (05.06xx.24)

“Our aircrews are trained and capable of rapidly shifting from operational missions to humanitarian roles. We planned to demonstrate how we, and our BORSTAR partners, respond>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC