SpaceX Launch To ISS Scrubbed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Tue, Jan 06, 2015

SpaceX Launch To ISS Scrubbed

SpaceX Says Next Launch Opportunity Is Friday If Issue Is Resolved

The SpaceX Falcon 9 launch scheduled for Tuesday morning at 6:20 a.m. EST aborted with one minute, 21 seconds left on the countdown clock. A thrust vector control actuator for the Falcon 9’s second stage failed to perform as expected, resulting in a launch abort.

SpaceX is evaluating the issue and will determine the next opportunity to launch the company’s fifth commercial resupply services mission to the International Space Station. The next available opportunity to launch to the station would be Friday, Jan. 9.

The weather at launch time was a concern as early as Monday, but SpaceX says that the weather had improved to "90 percent 'go'" as the countdown proceeded. The launch was scrubbed when “actuator drift” on the rocket’s second-stage thrust vector control system occurred late in the countdown, automatically triggering the abort. The issue will need to be resolved before Friday’s launch attempt, which would be at 5:09 a.m. EST.

Scrubbing the flight also means that SpaceX will not be able to test its at-sea recovery system for the Falcon 9 booster until Friday. The company will attempt the precision landing of a Falcon 9 first stage for the first time on a custom-built ocean platform known as the autonomous spaceport drone ship. While SpaceX has already demonstrated two successful soft water landings, executing a precision landing on an unanchored ocean platform is significantly more challenging.

The odds of success are not great—perhaps 50% at best. However this test represents the first in a series of similar tests that will ultimately deliver a fully reusable Falcon 9 first stage.

(Image provided by NASA)

FMI: www.spacex.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC