SpaceX Launch To ISS Scrubbed | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, Jan 06, 2015

SpaceX Launch To ISS Scrubbed

SpaceX Says Next Launch Opportunity Is Friday If Issue Is Resolved

The SpaceX Falcon 9 launch scheduled for Tuesday morning at 6:20 a.m. EST aborted with one minute, 21 seconds left on the countdown clock. A thrust vector control actuator for the Falcon 9’s second stage failed to perform as expected, resulting in a launch abort.

SpaceX is evaluating the issue and will determine the next opportunity to launch the company’s fifth commercial resupply services mission to the International Space Station. The next available opportunity to launch to the station would be Friday, Jan. 9.

The weather at launch time was a concern as early as Monday, but SpaceX says that the weather had improved to "90 percent 'go'" as the countdown proceeded. The launch was scrubbed when “actuator drift” on the rocket’s second-stage thrust vector control system occurred late in the countdown, automatically triggering the abort. The issue will need to be resolved before Friday’s launch attempt, which would be at 5:09 a.m. EST.

Scrubbing the flight also means that SpaceX will not be able to test its at-sea recovery system for the Falcon 9 booster until Friday. The company will attempt the precision landing of a Falcon 9 first stage for the first time on a custom-built ocean platform known as the autonomous spaceport drone ship. While SpaceX has already demonstrated two successful soft water landings, executing a precision landing on an unanchored ocean platform is significantly more challenging.

The odds of success are not great—perhaps 50% at best. However this test represents the first in a series of similar tests that will ultimately deliver a fully reusable Falcon 9 first stage.

(Image provided by NASA)

FMI: www.spacex.com

Advertisement

More News

Airborne 06.30.25: US v ADS-B Misuse, NatÂ’l STOL Fire, Volocopter Resumes

Also: Netherlands Donates 18 F16s, 2 737s Collide On Ramp, E-7 Wedgetail Cut, AgEagle's 100th In S Korea The Pilot and Aircraft Privacy Act was introduced in the House by Represent>[...]

Aero-News: Quote of the Day (07.06.25)

“This delivery represents more than just a milestone. It symbolizes our shared commitment to national security and our unwavering support for the men and women who serve on t>[...]

ANN's Daily Aero-Linx (07.06.25)

Aero Linx: Vintage Wings of Canada Foundation Vintage Wings of Canada is a not-for-profit, charitable organization with a collection of historically significant aircraft and is run>[...]

Classic Aero-TV: Portrait of the Army Aviation Heritage Foundation

From 2023 (YouTube Edition): To Preserve and Teach Incorporated as a non-profit domestic corporation in June 1997, the Army Aviation Heritage Foundation (AAHF) is a one-of-a-kind, >[...]

Airborne-NextGen 07.01.25: Volocopter Returns, B23 Energic, Iran Tech In UAVs?

Also: Air Taxis May Be Close, AgEagle Sells 100th, VAI Likes Bedford, AURA AERO Cleans Up Volocopter has resumed work towards the certification of its VoloCity eVTOL, this time und>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC