NASA Continues Orion Parachute Testing For Orbital Test Flight | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Sun, Mar 04, 2012

NASA Continues Orion Parachute Testing For Orbital Test Flight

Test Vehicle Dropped From A C-17 At FL250

On Feb. 29, NASA successfully conducted another drop test of the Orion crew vehicle's entry, descent and landing parachutes high above the Arizona desert in preparation for the vehicle's orbital flight test in 2014. An Air Force C-17 plane dropped a test version of Orion from an altitude of 25,000 feet above the U.S. Army's Yuma Proving Grounds in Arizona. Orion's drogue chutes were deployed between 15,000 and 20,000 feet, followed by the pilot parachutes, which deployed the main landing parachutes. Orion landed on the desert floor at a speed of almost 17 mph, well below the maximum designed touchdown speed of the spacecraft.

The test examined how Orion's wake, the disturbance of the air flow behind the vehicle, would affect the performance of the parachute system. Parachutes perform optimally in smooth air that allows proper lift. A wake of choppy air can reduce parachute inflation. The test was the first to create a wake mimicking the full-size Orion vehicle and complete system.

Since 2007, the Orion program has conducted a vigorous parachute air and ground test program and provided the chutes for NASA’s successful pad abort test in 2010. All of the tests build an understanding of the chutes’ technical performance for eventual human-rated certification.(Images provided by NASA)

FMI: www.nasa.gov/orion

 


Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC