Blue Origin to Build Artemis V Moon Lander | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Thu, Jun 01, 2023

Blue Origin to Build Artemis V Moon Lander

Once In a Blue Moon

The American astronauts to venture to the moon’s surface during NASA’s planned 2029 Artemis V mission will do so aboard a lunar-lander designed and built by Blue Origin—the Auburn, Washington-based space technology concern founded by Amazon mogul Jeff Bezos.

While NASA announced the award of the $3.4-billion Artemis V lunar lander contract on 19 May 2023, the space agency was uncharacteristically reticent vis-à-vis the deal’s specifics. Blue Origin’s Blue Moon lander remains under development and it, or an evolution thereof, will likely be the vehicle by which the  Artemis V moonwalkers are conveyed to and from the lunar surface.

In a statement pertaining to the contract, Blue Origin set forth its own contribution to the lander’s design and construction will be “well north” of the contract’s $3.4-billion value.

Boeing, Lockheed Martin, and Draper are among the subcontractors slated to provide components and systems to the Blue Moon vessel.

Artemis V will ostensibly see four astronauts launched moonward by a United Launch Alliance (ULA) Space Launch System (SLS) rocket. The crew will travel aboard an Orion Multi-Purpose Crew Vehicle (Orion MPVC)—a partially-reusable spacecraft comprising a Crew-Module (CM) space-capsule designed by Lockheed-Martin, and a Service-Module (SM) designed by Airbus Defense and Space.

Capable of sustaining a crew of six beyond low Earth orbit for up to 21-days undocked and six-months docked, Orion is operated via a glass-cockpit interface modeled after the EFIS suite intrinsic to Boeing’s 787 Dreamliner. The spacecraft’s primary propulsion is provided by a single Aerojet Rocketdyne AJ10 hypergolic rocket engine. Secondary (maneuvering) propulsion is generated by an Airbus-designed system consisting of eight R-4D-11 engines and six reaction control pods.

Excepting an increased diameter, updated thermal protection, and modern digital processing systems, Orion’s general configuration approximates that of the Apollo-era Command and Service Modules (CSM).

Orion’s exceptional endurance derives largely of the vessel’s reliance upon solar-panels rather than fuel-cells.

The lunar landings salient to NASA’s planned December 20025 Artemis III and September 2028 Artemis IV missions will be made in SpaceX’s Starship spacecraft. Blue Origin—which presented unsuccessful bids for the missions—objected to NASA’s decision to award the contracts to SpaceX, and sued the space agency, alleging it had ignored safety shortfalls inherent the Starship vehicle. A federal court dismissed the claims.

The Artemis V lunar lander contract is a coup of sorts for Blue Origin. While Bezos’s space firm has been awarded NASA contracts for the planned Orbital Reef Low Earth Orbit (LEO) space station and a near-future Mars scientific mission, the company, heretofore, has been boxed out of the lucrative lunar-landing business. In addition to earning Blue Origin sizable cuts of prestige and Artemis cash, the award of the lunar lander contract instantiates NASA’s increasing reliance upon private-sector partners and speaks compellingly to the end of government’s extra-planetary hegemony.

FMI: www.nasa.gov

Advertisement

More News

Classic Aero-TV: Extra Aircraft Announces the Extra 330SX

From 2023 (YouTube Edition): An Even Faster Rolling Extra! Jim Campbell joined General Manager of Extra Aircraft Duncan Koerbel at AirVenture 2023 to talk about what’s up and>[...]

Aero-News: Quote of the Day (11.15.25)

“Receiving our Permit to Fly and starting Phase 4 marks a defining moment for Vertical Aerospace. Our team has spent months verifying every core system under close regulatory>[...]

ANN's Daily Aero-Term (11.15.25): Middle Marker

Middle Marker A marker beacon that defines a point along the glideslope of an ILS normally located at or near the point of decision height (ILS Category I). It is keyed to transmit>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

Airborne 11.14.25: Last DC-8 Retires, Boeing Recovery, Teeny Trig TXP

Also: ATI Strike Prep, Spirit Still Troubled, New CubCrafters Dealership, A-29 Super Tucano Samaritan’s Purse is officially moving its historic Douglas DC-8 cargo jet into re>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC