Griffin Warns NASA Workers Of Job Cuts | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneUnlimited-
10.14.25

Airborne-Unlimited-10.15.25

Airborne-NextGen-10.16.25

AirborneUnlimited-10.17.25

Sun, May 22, 2005

Griffin Warns NASA Workers Of Job Cuts

Planning Ahead For 2010

NASA Administrator Michael Griffin met with workers at Kennedy Space Center Friday to discuss upcoming job changes and cuts. He said that many jobs will have to change and some will be lost as the agency prepares to shut down the shuttle program and develop a new spaceship.

"I report to the president," said Griffin according to media reports. "The president has said we're retiring the orbiter by 2010, and that's what we're doing."

"Not everyone will transition," he said. "One of the main issues with the orbiter is how much it takes to care and feed the fleet."

Griffin warned employees that the transition will be a challenge. "You enter a period where you need to watch out for yourself, and you need to look out for new opportunities."

"The new system must have lower fixed costs," Griffin said of the proposed Crew Exploration Vehicle in a hearing before a Senate oversight committee Wednesday. "Lower fixed costs means a smaller work force."

Griffin said that he would be would be working to narrow the gap between the retirement of the shuttles and the replacement ship to reduce the loss of skilled workers. However, he will not rush the project.

"If it takes more than five years, then it does," said Griffin according to Florida Today. "It will take what it takes."

FMI: www.nasa.gov

Advertisement

More News

Airborne 10.15.25: Phantom 3500 Confounds, Citation CJ3 Gen2 TC, True Blue Power

Also: Kodiak 100 Joins USFS, Innovative Solutions & Support Renamed, Gulfstream Selects Honeywell, Special Olympics Airlift The Phantom 3500 mockup made an appearance where the>[...]

Airborne 10.14.25: Laser Threat, VeriJet BK, Duffy Threatens Problem Controllers

Also: USAF Pilots, Atlanta Tower Evac, Archer Spotlight Dissipates, Hop-A-Jet Sues A social-media call for people to point lasers at aircraft flying over Portland’s ICE facil>[...]

Aero-News: Quote of the Day (10.20.25)

“We developed this prototype from concept to reality in under a year. The U-Hawk continues the Black Hawk legacy of being the world’s premier utility aircraft and opens>[...]

ANN's Daily Aero-Term (10.20.25): Flameout Pattern

Flameout Pattern An approach normally conducted by a single-engine military aircraft experiencing loss or anticipating loss of engine power or control. The standard overhead approa>[...]

NTSB Final Report: Schweizer SGS 2-33A

Student Pilot’s Failure To Maintain Airspeed And Altitude Resulting In A Collision With The Ground During The Base To Final Turn Analysis: The solo student pilot reported she>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC