NASA Gauges Interest In Retired Space Vehicles | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Dec 19, 2008

NASA Gauges Interest In Retired Space Vehicles

Psst... Wanna Buy A Shuttle? Got $42 Mil?

NASA has issued a Request for Information, or RFI, seeking ideas from educational institutions, science museums and other appropriate organizations about the community's ability to acquire and publicly display the space shuttle orbiters and space shuttle main engines after the conclusion of the Space Shuttle Program.

The RFI targets "educational institutions, science museums, and other appropriate organizations" which may benefit from displaying one of the three remaining shuttles. The space agency says it will use information gained from the RFI to develop strategies for eventual placement of two space shuttle orbiters and a minimum of six unassembled space shuttle main engine display "kits."

But, fair warning... if you want to put Endeavour in your hangar, it's gonna cost you.

"NASA estimates the total cost to be incurred by a recipient organization for safing one Orbiter, preparing it for final display, and delivery by ferry flight to a US destination airport at approximately $42 million," NASA writes in the nine-page RFI. "This $42 million estimate includes a $6 million cost to air ferry the Orbiter by Shuttle Carrier Aircraft from the Kennedy Space Center to a US destination airport... It does not take into account special measures that may be required in specific situations such as transporting the Orbiter long distances over public roadways which may require removal of light posts and traffic signals or transport by barge over water."

For the more budget-minded, NASA also plans to make at least six, non-flight-worthy unassembled or partially assembled but largely complete Space Shuttle Main Engines as early as mid-2009, with a complete static display of one engine available for between $400,000 - $800,000, less shipping.

The RFI doesn't specify what NASA plans to do with the money... though it's a safe bet the cash-strapped agency will use at least some of the money on its Constellation manned spacecraft program.

"While NASA's priority is flying the remaining Shuttle missions safely, because of the quantity, complexity, and dispersion of the Space Shuttle Program (SSP) assets, successful Space Shuttle transition and retirement requires careful planning prior to program completion, currently scheduled for September 2010," the agency notes.

FMI: www.nasa.gov/transition

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC