ISS Gyroscope Up And Running | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Mon, Jul 05, 2004

ISS Gyroscope Up And Running

Tests Show Spacewalk Paid Off

A newly reactivated gyroscope on the International Space Station today was successfully brought on line for attitude control at 6:20 a.m. CDT. The Control Moment Gyroscope 2 was fully operational at 6,600 revolutions per minute Thursday afternoon after being powered back on as a result of this week’s spacewalk. Testing overnight proved its operation adequate for orientation control.

Expedition 9 Commander Gennady Padalka and Flight Engineer and NASA ISS Science Officer Mike Fincke replaced a failed circuit breaker providing power to the gyroscope during a 5-hour, 40-minute spacewalk Wednesday. The gyroscope now joins two others in controlling the Station’s orientation during normal operations.

Today the crew completed clean-up tasks for the spacewalk, including hanging the Russian Orlan-M spacesuits out to dry, stowing tools and conducting a follow-up conference with spacewalk specialists. Tomorrow the sleep shift schedule for the crewmembers will be back to normal as they begin a three-day weekend to commemorate the US Independence Day holiday Monday. The crew will finish up spacewalk close out tasks next week and is scheduled to work on science experiments, such as the Advanced Diagnostic Ultrasound in Microgravity.

FMI: http://spaceflight.nasa.gov

Advertisement

More News

Airborne-NextGen 11.04.25: Anduril YFQ-44A, Merlin SOI 2, UAV Rulemaking Stalled

Also: Horizon Picks P&W PT6A, Army Buys 3 EagleNXT, First Hybrid-Electric Regional, Army Selects AEVEX Anduril Industries’ YFQ-44A Collaborative Combat Aircraft was flown>[...]

NTSB Prelim: Elmore Travis C Searey

While Flying North Along The Beach At About 300 Ft Above Ground Level, The Pilot Reported That The Engine RPM Dropped To About Idle On September 28, 2025, at 1126 eastern daylight >[...]

ANN's Daily Aero-Linx (11.03.25)

Aero Linx: European Association of Aviation Training and Educational Organisations (EATEO) Welcome to the “ European Association of Aviation Training and Education Organizati>[...]

ANN's Daily Aero-Term (11.03.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

Aero-News: Quote of the Day (11.03.25)

“It also gives us the hard data we need to shape requirements, reduce risk, and ensure the CCA program delivers combat capability on a pace and scale that keeps us ahead of t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC