F-35 Program 'On Right Track,' Program's Director Says | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Apr 17, 2015

F-35 Program 'On Right Track,' Program's Director Says

HASC Hears Update From Lt. Gen Christopher Bogdan

Despite its numerous setbacks, the F-35 Lightning II joint strike fighter program is on the right track to meet aircraft delivery deadlines, the program’s executive officer told a House Armed Services Committee (HASC) panel Wednesday.

Air Force Lt. Gen. Christopher C. Bogdan updated members of the committee’s tactical air and land forces subcommittee on the F-35 program as part of the president’s fiscal year 2016 budget request.

“Our overall assessment is we’re making slow but steady progress on all fronts, and each day, the program is improving,” Bogdan said. “This is not to say that we don’t have some risks, challenges and difficulties, but I’m confident we’ll be able to overcome these problems and deliver on our commitments.”

That progress covers development, flight training, production, maintenance and the standup of the global sustainment enterprise, he said.

Bogdan also said the program is nearing completion of its flight testing to field initial warfighting capabilities, even though certain software issues and other issues have created delays.

“The last year also presented [some] failures,” Bogdan said, citing an engine failure at Eglin Air Force Base, Florida, and the discovery of cracks in the F-35’s B-model bulkhead during durability testing. “We’re working hard to bring this schedule delay back in on time and we don’t believe it will impact (delivery to the services),” he added.

Bogdan cited the F-35’s accomplishments in the last year. Those included initial sea trials aboard the USS Nimitz for the F-35C model produced “excellent” performance results, Bogdan said, and production of the F-35 went according to plan.

“We planned on delivering 36 [aircraft in 2014], and delivered 36 to our warfighters,” Bogdan said. “We have now delivered a total of 130 aircraft to our operational test and training sites.”

The production line is running about two months behind, the general acknowledged, but he added that the process is catching up and said the delay does not pose any long-term schedule or delivery risks to the program.

“We intend to continue leading the program with integrity, discipline, transparency and accountability,” Bogdan told panel members. “We will hold ourselves and our program team accountable for the outcomes of this program.”

(Images provided by the DoD)

FMI: www.defense.gov

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC