FAA Begins Design Work On New BWI Tower | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Mon, Jun 24, 2013

FAA Begins Design Work On New BWI Tower

Will Replace 30-Year-Old Structure At Baltimore-Washington International Airport

The FAA is in the preliminary planning stages for a new control tower at Baltimore-Washington International Airport (KBWI) which will replace the existing 30-year-old facility. The project is estimated to cost not less than $26 million.

The Baltimore Sun reports that the FAA looked at the option of renovating the existing tower, assessing the structure's age and location on the airport above Concourse C, before deciding to build a new structure. The process also included projections of future air traffic, staffing levels, and technology.

Initial plans call for a tower that is 228 feet tall, or about 100 feet taller than the existing tower. The agency is conducting "a complete technical analysis of potential tower sites," according to BWI Executive Director Paul Wiedefeld.

The FAA is working with the airport authority to coordinate the tower construction with the airport's master plan, which calls for opening an expanded terminal this summer, along with long-term plans to upgrade Concourse D and expand use of Concourse E by international carriers.

The FAA says it is "determining when funding may be available and working with the airport to identify a site for the new facility," according to an agency spokeswoman.

(Image source FAA.)

FMI: www.bwiairport.com, www.faa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC