Shuttle Test Underway At KSC | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Tue, May 03, 2005

Shuttle Test Underway At KSC

...And The STS-114 Commander Is Just Fine With Delay

With the space shuttle's Return to Flight delayed for at least two months, Discovery's crew is getting in a little extra practice this week. Commander Eileen Collins and her six crew members were at the Kennedy Space Center Tuesday for a countdown exercise to be conducted before the space plane is rolled back to the Vehicle Assembly Building. There, engineers will further modify Discovery's external fuel tank to mitigate the possibility that falling debris might damage the orbiter.

If you ask STS-114 Commander Eileen Collins about NASA's decision to delay the launch of Discovery until at least July, she'll tell you she's just fine with the idea.

"I truly believe we've made the right decision in going to July," Collins told Florida Today. "It's going to give the teams more time to prepare. And like anything in life, the longer you prepare for something, the better it's going to be. We want this mission to be very, very successful."

The countdown exercise continues through Tuesday, culminating Wednesday at approximately 1100 local, when the crew, which will be on board the shuttle, simulates a main engine shutdown.

"This is a great event for our crew," Collins (below) said. "This is great practice for them as well as it is for us."

As ANN reported last week, NASA leaders decided to hold off on the first launch since the destruction of shuttle Columbia two years ago because of potential ice build-ups on the external tank. Engineers were also pondering other, less critical problems that, together, prompted them to delay the launch beyond the May 15th - June 3rd window. The next launch window opens on July 13th.

FMI: www.nasa.gov

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC