HUMS Data To Extend Life Of S-92 Helicopter Main Rotor Hub | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Fri, Nov 09, 2012

HUMS Data To Extend Life Of S-92 Helicopter Main Rotor Hub

Sikorsky Gets FAA Approval For The Program

The FAA has approved the grant of life extensions for the Main Rotor Hub on Sikorsky's S-92 helicopter platform to the company. Through its aftermarket business, Sikorsky Aerospace Services (SAS), Sikorsky Aircraft will have the ability to utilize Health and Usage Monitoring System (HUMS) data to determine a one-time life adjustment for particular serial number main rotor hubs in accordance with a methodology accepted by the FAA.

"Beyond monitoring for failure prevention, we have now advanced the usage of HUMS data into the realm of operating cost reductions," said Steve Bohlman, SAS Director, Global Service & Support. "By obtaining FAA approval for our methodology, we have achieved an industry first. Extending the life of a component through individual aircraft usage monitoring is an important first step in using HUMS data to proactively reduce the operating and maintenance cost of the S-92 aircraft."

The S-92 helicopter incorporates numerous safety features, including a flaw tolerant design, and Sikorsky continues to make safety and performance upgrades. HUMS provides another safety enhancement by allowing the SAS Fleet Management Operations Center (FMOC) in Connecticut to monitor, on a continual basis, the health of the worldwide S-92 helicopter fleet. Data collected by the FMOC helps identify maintenance conditions including whether components are wearing as expected.   

The life calculation of the S-92A Main Rotor Hub is significantly influenced by rotor blade centrifugal force and the number of Ground-Air-Ground (GAG) cycles. Based on Sikorsky's FAA-approved life calculation methodology, the recommended retirement time for the hub is 4,900 hours. Sikorsky engineering teams have developed a new method for managing the retirement time of the rotor hub. This FAA-approved methodology accounts for actual usage and permits a one-time life extension, while maintaining the same margin of safety.  

"The success of this simple HUMS-based retirement procedure serves as a precursor for implementing more sophisticated technologies to manage component retirement times," said Dr. Andreas Bernhard, SAS Director of Analytics & Technology and Chief Engineer. "This paradigm change will result in significant cost savings and reduction of the operator's maintenance burden – as well as impact the design of new products. These types of methodologies can realize optimal weight design and achieve reliability through continuous monitoring of usage, loads, and health."

(File photo Sikorsky S-92)

FMI: www.sikorsky.com, www.faa.gov

Advertisement

More News

ANN's Daily Aero-Linx (05.06.25)

Aero Linx: International Federation of Airworthiness (IFA) We aim to be the most internationally respected independent authority on the subject of Airworthiness. IFA uniquely combi>[...]

ANN's Daily Aero-Term (05.06.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

ANN FAQ: Q&A 101

A Few Questions AND Answers To Help You Get MORE Out of ANN! 1) I forgot my password. How do I find it? 1) Easy... click here and give us your e-mail address--we'll send it to you >[...]

Classic Aero-TV: Virtual Reality Painting--PPG Leverages Technology for Training

From 2019 (YouTube Edition): Learning To Paint Without Getting Any On Your Hands PPG's Aerospace Coatings Academy is a tool designed to teach everything one needs to know about all>[...]

Airborne 05.02.25: Joby Crewed Milestone, Diamond Club, Canadian Pilot Insurance

Also: Sustainable Aircraft Test Put Aside, More Falcon 9 Ops, Wyoming ANG Rescue, Oreo Cookie Into Orbit Joby Aviation has reason to celebrate, recently completing its first full t>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC