Navy Closes In On Making Landing On Aircraft Carrier Safer | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sat, Jun 29, 2013

Navy Closes In On Making Landing On Aircraft Carrier Safer

Joint Precision Approach And Landing System Trials Conducted Aboard USS George H.W. Bush

Landing on an aircraft carrier is now safer thanks to the Joint Precision Approach and Landing System (JPALS) team from the Naval Air Traffic Management Systems Program Office (PMA-213). JPALS is an all-weather landing system that uses a Global Positioning System and navigation systems to safely land both land- and sea-based aircraft. JPALS completed its latest round of testing aboard the USS George H.W. Bush (CVN 77) in late May.

The 52-person team spent 11 days aboard the carrier testing the latest JPALS software with two F/A-18C Hornet aircraft from Air Test and Evaluation Squadron (VX) 23, and an MH-60S helicopter from Air Test and Evaluation Squadron (HX) 21, based at Naval Air Station Patuxent River. A modified Beechcraft King Air flying from St. Mary’s County Airport was also used as a test bed aircraft.
 
“The Hornets flew 65 low approaches to touch-and-go or full-stop landings during our two weeks on CVN 77,” said Lee Mason, PMA-213’s JPALS Ship System integrated program team lead. “The King Air completed 29 low approaches. So far, we are very pleased with the results. The system is expected to achieve tremendously improved landing accuracy.” With the completion of this two-week test period, the JPALS program transitioned into the second phase of integrated test, establishing the system requirements verification for JPALS, Mason added.

“The data generated from this two-week, at-sea period is undergoing detailed analysis by our experts. This analysis will, in turn, be used to validate and verify the system is accurate and working,” said Capt. Darrell Lack, PMA-213 program manager.
 
Later this summer, JPALS is scheduled to complete additional at-sea testing to further refine the verification and validation effort and enable the completion of the operational assessment of the JPALS ship system, which is needed to progress to the program’s next milestone, Lack added. “JPALS will provide adverse weather, adverse terrain, day and night, and survivable precision approach and landing capability that supports service and multi-national interoperability,” Lack said. “It is particularly suitable for the F-35, future aircraft and unmanned air vehicle operations at sea.”

(Image provided by the U.S. Navy.)

FMI: www.navsea.navy.mil

Advertisement

More News

ANN FAQ: Contributing To Aero-TV

How To Get A Story On Aero-TV News/Feature Programming How do I submit a story idea or lead to Aero-TV? If you would like to submit a story idea or lead, please contact Jim Campbel>[...]

Classic Aero-TV: Bob Hoover At Airventure -- Flight Test and Military Service

From 2011 (YouTube Edition): Aviation's Greatest Living Legend Talks About His Life In Aviation (Part 5, Final) ANN is pleased to offer you yet another snippet from the public conv>[...]

Aero-News: Quote of the Day (11.12.25)

“All Air Traffic Controllers must get back to work, NOW!!! Anyone who doesn’t will be substantially ‘docked. For those Air Traffic Controllers who were GREAT PATR>[...]

ANN's Daily Aero-Linx (11.12.25)

Aero Linx: American Navion Society Welcome to the American Navion Society. Your society is here to support the Navion community. We are your source of technical and operating infor>[...]

ANN's Daily Aero-Term (11.12.25): Glideslope Intercept Altitude

Glideslope Intercept Altitude The published minimum altitude to intercept the glideslope in the intermediate segment of an instrument approach. Government charts use the lightning >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC