Arianespace Reaches Key Preparation Milestones For The Next Two Flights | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Mar 17, 2019

Arianespace Reaches Key Preparation Milestones For The Next Two Flights

Vega And Soyuz Missions Are Next On The 2019 Manifest

The Spaceport is busy with activity as preparations advance for the next Vega and Soyuz missions – which will mark Arianespace’s third and fourth flights of 2019, respectively, as the company builds upon its two launch successes performed earlier this year.

First in line is the Vega launch, designated Flight VV14 in Arianespace’s numbering system, which will deliver the PRISMA (PRecursore IperSpettrale della Missione Applicativa) Earth observation satellite to Sun-synchronous orbit on a mission targeted for March 21.

The launcher has completed its build-up at the Spaceport, allowing final checkout to begin. This assembly process concluded with integration of Vega’s “upper composite,” consisting of PRISMA and its protective payload fairing. Installation took place at the Spaceport’s SLV launch site, inside the facility’s protective mobile gantry.

PRISMA – was built for the ASI Italian space agency by OHB ITALIA as prime contractor, with LEONARDO responsible for the payload. Once operational, it will provide major applications to protect both our planet and Italy’s national environmental safety. Fitted with a state-of-the-art electro-optical instrument, made by a medium resolution photo camera sensitive to all the visible range (panchromatic) and by an innovative hyperspectral sensor, it will employ these capabilities for environmental monitoring, resources management, identification and classification of crops, fight against pollution, etc.

PRISMA will be the third satellite launched at the service of ASI by Arianespace, whose backlog comprises two other spacecraft for the Italian space agency. The PRISMA satellite was designed and manufactured by a consortium of Italian companies led by OHB ITALIA which provided a dedicated platform hosting the payload supplied by LEONARDO.

As key progress is made for Flight VV14, payload integration is underway for Arianespace’s second Soyuz mission of 2019 – Flight VS22 – which will further expand the SES-owned O3b satellite constellation delivering low-latency, fiber-like connectivity to customers in more than 40 countries.

The second of four O3b satellites to be orbited on Arianespace’s upcoming Soyuz mission is integrated on the dispenser system during activity in the Spaceport’s S5 payload preparation building. This integration involves a step-by-step installation of the spacecraft on a tube-shaped dispenser system, with the activity taking place inside the Spaceport’s S5 payload preparation facility.

The O3b fleet of medium-Earth orbit (MEO) satellites is a proven non-geostationary constellation that provides commercial broadband services today, delivering carrier-grade services. The first 16 spacecraft for O3b were successfully orbited by four Soyuz vehicles operating from French Guiana in 2013, 2014 and 2018. Each satellite – built by Thales Alenia Space – weighs about 700 kg. at launch and provides more than 10 Gbps of capacity.

By increasing the size of the O3b constellation from 16 to 20 satellites, SES Networks will offer enhanced coverage while providing greater service availability and reliability – responding to increasing demand for bandwidth from governments, as well as the telecom, cloud, maritime and energy markets.

Arianespace has a busy launch schedule in 2019, targeting up to 12 missions from the Spaceport using its heavyweight Ariane 5, medium-lift Soyuz and lightweight Vega.

The company kicked off its launch calendar with the Ariane 5 flight that orbited Saudi Geostationary Satellite 1/Hellas Sat 4 and GSAT-31 on February 5; which was followed by the history-making first launch of OneWeb satellites, performed February 27 by Soyuz.

(Source: Arianespace news release. Image from file)

FMI: www.arianespace.com

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC