GPS OCX System Reaches Qualification Testing Milestone | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Mon, Jan 23, 2017

GPS OCX System Reaches Qualification Testing Milestone

Raytheon Is Developing The Next-Generation Launch And Checkout Controls

Another milestone has been reached by Raytheon in its development of the U.S. Air Force Global Positioning System Next-Generation Operational Control System, known as GPS OCX, with the completion of the Factory Qualification Test of the Launch and Checkout System (LCS). GPS OCX promises "dramatically" increased performance and security of the GPS system that benefits millions of people worldwide.

Raytheon tested 74 OCX segment requirements at its Aurora, Colorado, factory in a cyber-hardened environment, verifying that the LCS is well on its way to meeting U.S. Air Force requirements. Next, the remaining OCX segment requirements will be qualified in a retest period, and those requiring external interfaces will be qualified onsite at Schriever Air Force Base prior to delivery of the overall OCX LCS in 2017. The final phase of testing – Site Acceptance Testing – will follow the delivery of the system.

"The completion of the Factory Qualification Test proves we can meet the U.S. Air Force requirements and are on a path to delivering the OCX LCS in 2017," said Bill Sullivan, vice president and program manager for Raytheon's GPS OCX. "This critical system will enable the launch of the GPS III satellites, which represents the first major capability deployment in the U.S Air Force's effort to modernize GPS."

The Factory Qualification Test achievement builds upon other OCX milestones achieved in 2016, including:

  • Completion of Black Wide Area Network testing of unclassified external interfaces for GPS OCX with perfect scores on mission capability and cyber controls
  • 100 percent requirements pass rate on Electro-Magnetic Interference testing on the OCX Monitor Station Receiver Element, or OMSRE
  • Successful Critical Design Review for OMSRE hardware development
  • Completion of the LCS component-level qualification test
  • Risk-reduction testing functional checkout for the OCX ground system software, demonstrating OCX's capabilities for precision navigation and timing in a fully cyber-hardened environment

The U.S. Air Force-led GPS Modernization Program will yield new positioning, navigation and timing capabilities for U.S. military and civilian users across the globe.

(Image provided with Raytheon news release)

FMI: www.raytheon.com

Advertisement

More News

Airborne 11.05.25: Tesla Flying Car?, Jepp/ForeFlight Sold, A220 Troubles

Also: AFE25 Tickets!, Jamaica Recovery, E-Aircraft at Boeing Fld, Diamond DA50 RG Cert Elon Musk is once again promising the impossible…this time, in the form of a Tesla tha>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

Aero-News: Quote of the Day (11.05.25)

“Our strategic partnership with AutoFlight, backed by their substantial technological expertise and tangible advancements in eVTOL airworthiness, represents a significant mil>[...]

ANN's Daily Aero-Linx (11.05.25)

Aero Linx: British Gliding Association (BGA) The British Gliding Association is the governing body for the sport of gliding in the UK and members are the 76 clubs that provide glid>[...]

NTSB Prelim: Cirrus Design Corp SR22

While Descending Toward ASN, He Advanced The Throttle, But The Engine Did Not Respond On October 2, 2025, at 1126 central daylight time, a Cirrus SR22, N812SE, was substantially da>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC