AH-1Z Super Cobra Completes Envelope Expansion Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.03.25

AirborneNextGen-
11.04.25

Airborne-Unlimited-11.05.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-10.17.25

Affordable Flying Expo Tickets (Discount Code: AFE2025): CLICK HERE!
LIVE MOSAIC Town Hall, 1800ET, 11.07.25: www.airborne-live.net

Tue, Jan 07, 2003

AH-1Z Super Cobra Completes Envelope Expansion Testing

The first AH-1Z SuperCobra test aircraft ended 2002 on a high note having completed the envelope expansion portion of the test program and achieving more than 400 flight test hours. With envelope expansion finished, AH-1Z testers have completed the first major portion of flight testing on the Marine Corps’ newest attack helicopter.

“In envelope expansion, we essentially determine how high and how fast the aircraft can go,” explained Vic DiSanto, systems engineer with the H-1 Integrated Test Team here. “We start at a hover and go from there.”

In between, DiSanto explained, test pilots and engineers check the aircraft’s performance against engineering estimates at various airspeeds, altitudes and G loadings – from zero altitude, zero airspeed at one G (a hover) to the maximum airspeed, altitude and G loading (both negative and positive) the aircraft can safely withstand. Once validated by these tests, the data will be used as the basis for the platform’s NATOPS manual – the operating manual developed for each aircraft.

During this first phase of flight testing, AH-1Z test pilots and engineers took the test aircraft to 220 kts, maneuvered to –0.3 to +3.5 G’s and reached a 16,000-foot altitude since its first flight in December, 2000.

"Having accomplished 400 hours of envelope expansion test flying during the first 24 months of engineering and manufacturing development on this airframe exemplifies the dependability, reliability and maintainability in the design of the AH-1Z,” stated Lt.Col. Nic Hall, government flight test director for the H-1 ITT. “Especially so considering the average AH-1W fleet utilization rate is 300 hours per year."

With these milestones accomplished, the aircraft turns next to external stores jettison testing, where the aircraft tests it’s capability to safely and effectively rid itself of anything attached to its six “hard points” in the event of an emergency or malfunction.

By the holiday break, Zulu One had already flown 7.5 hours testing Hellfire missile rack jettisons. The test articles being dropped were inert and ballasted to represent fully armed and capable missiles.

Additionally, the three AH-1Z test aircraft recently supported cockpit mapping for the Thales Top Owl helmet-mounted display. [ANN Thanks John C. Milliman, PMA-276 Public Affairs Officer]

FMI: http://www.navair.navy.mil/

Advertisement

More News

Airborne 11.05.25: Tesla Flying Car?, Jepp/ForeFlight Sold, A220 Troubles

Also: AFE25 Tickets!, Jamaica Recovery, E-Aircraft at Boeing Fld, Diamond DA50 RG Cert Elon Musk is once again promising the impossible…this time, in the form of a Tesla tha>[...]

Airborne 11.07.25: Affordable Expo Starts!, Duffy Worries, Isaacman!

Also: Louisville UPS Crash Aftermath, Taiwan Boosts Pilot Pool, Spartan Acquires, DON’T MISS the MOSAIC Town Hall! This three-day Affordable Flying Expo brings together indoo>[...]

Aero-News: Quote of the Day (11.05.25)

“Our strategic partnership with AutoFlight, backed by their substantial technological expertise and tangible advancements in eVTOL airworthiness, represents a significant mil>[...]

ANN's Daily Aero-Linx (11.05.25)

Aero Linx: British Gliding Association (BGA) The British Gliding Association is the governing body for the sport of gliding in the UK and members are the 76 clubs that provide glid>[...]

NTSB Prelim: Cirrus Design Corp SR22

While Descending Toward ASN, He Advanced The Throttle, But The Engine Did Not Respond On October 2, 2025, at 1126 central daylight time, a Cirrus SR22, N812SE, was substantially da>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC