Center Fuselage For Italy's First F-35 Lightning II Delivered | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.29.24

Airborne-Unlimited-04.23.24

Airborne-Unlimited-04.24.24 Airborne-FltTraining-04.25.24

Airborne-Unlimited-04.26.24

Thu, Jul 25, 2013

Center Fuselage For Italy's First F-35 Lightning II Delivered

Airplane To Be Assembled In Italy, Increasing International Participation

The center fuselage for Italy's first F-35 Lightning II has been delivered to the newly commissioned Final Assembly and Check Out (FACO) facility at Italy's Cameri Air Base July 12. This on-time delivery to Lockheed Martin enables the first assembly of an F-35 aircraft at the FACO facility and increases international participation on the F-35 program.

The center fuselage, AL-1, will be integrated into a conventional takeoff and landing variant of the F-35, and represents the first of 90 center fuselage sections that will be delivered to the Italian FACO facility for Italian aircraft.

"We started working on AL-1 in September 2012, when it was inducted into our Integrated Assembly Line [IAL] at our Palmdale facility," said Michelle Scarpella, vice president of the F-35 program for prime contractor Northrop Grumman. "It's the 115th center fuselage we've completed here in Palmdale, and marks another program milestone, as we continue to stand up and grow international F-35 participation."

The IAL maximizes robotics and automation, providing additional assembly capability while meeting engineering tolerances that are not easily achieved using manual methods. The IAL is central in producing the F-35's center fuselage as well as increasing the program's affordability, quality and efficiency. Currently, there are 35 center fuselages in flow on the IAL, including some for Australia and additional ones for Italy; deliveries have already been made to Ft Worth for final assembly and delivery to the Netherlands and the United Kingdom.

Set on 101 acres in Italy's Piedmont region, the FACO facility at Cameri will be one of a kind in Europe. With 22 buildings, more than a million square feet of covered work space, 11 final assembly workstations – including four outfitted for electronic mate and assembly – and five maintenance, repair, overhaul and upgrade bays, the FACO at Cameri is positioned to serve as a new hub for the Italian aerospace industry.

(Image provided by Northrop Grumman)

FMI: www.northropgrumman.com

Advertisement

More News

ANN's Daily Aero-Term (04.28.24): Airport Marking Aids

Airport Marking Aids Markings used on runway and taxiway surfaces to identify a specific runway, a runway threshold, a centerline, a hold line, etc. A runway should be marked in ac>[...]

Aero-News: Quote of the Day (04.28.24)

"It is extremely difficult, if not impossible, for manned aircraft to see a drone while conducting crop-enhancing and other aerial applications at low altitudes and high speeds. We>[...]

ANN's Daily Aero-Linx (04.28.24)

Aero Linx: The Skyhawk Association The Skyhawk Association is a non-profit organization founded by former Skyhawk Pilots which is open to anyone with an affinity for the A-4 Skyhaw>[...]

Aero-News: Quote of the Day (04.29.24)

“The T-54A benefits from an active Beechcraft King Air assembly line in Wichita, Kansas, where all required METS avionics and interior modifications are installed on the line>[...]

ANN's Daily Aero-Linx (04.29.24)

Aero Linx: Aerostar Owners Association The Association offers the Aerostar Owner a unique opportunity to tap an invaluable source of information concerning the care and feeding of >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC