AD: Bombardier, Inc., Airplanes | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Nov 07, 2021

AD: Bombardier, Inc., Airplanes

AD 2021-21-04 Prompted By Reports That The Sliding Bushings In The Forward Engine Mount System Were Missing

The FAA is adopting a new airworthiness directive (AD) for certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 airplanes.

This AD was prompted by reports that the sliding bushings in the forward engine mount system were missing. This AD requires an inspection (gap check) of the front and aft engine mounts to verify the proper installation of the sliding bushings, and repair if necessary. The FAA is issuing this AD to address the unsafe condition on these products. This AD is effective December 8, 2021.

Supplementary Information: Transport Canada Civil Aviation (TCCA), which is the aviation authority for Canada, has  issued TCCA AD CF-2021-04, dated February 15, 2021 (also referred to as the Mandatory Continuing Airworthiness Information, or the MCAI), to correct an unsafe condition for certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 airplanes. You may examine the MCAI in the AD docket on the internet at https://www.regulations.gov by searching for and locating Docket No. FAA-2021-0560.

The FAA issued a notice of proposed rulemaking (NPRM) to amend 14 CFR part 39 by adding an AD that would apply to certain Bombardier, Inc., Model BD-700-1A10 and BD-700-1A11 airplanes. The NPRM published in the Federal Register on July 9, 2021 (86 FR 36243). The NPRM was prompted by reports that the sliding bushings in the forward engine mount system were missing.

The NPRM proposed to require an inspection (gap check) of the front and aft engine mounts to verify the proper installation of the sliding bushings, and repair if necessary. The FAA is issuing this AD to address redistribution of load/stress on the mount components, which may decrease the component fatigue life; failure of the mount structural components could result in the loss of the engine attachment to the airframe. See the MCAI for additional background information.

FMI: www.regulations.gov

Advertisement

More News

ANN's Daily Aero-Term (12.13.25): Light Gun

Light Gun A handheld directional light signaling device which emits a brilliant narrow beam of white, green, or red light as selected by the tower controller. The color and type of>[...]

Aero-News: Quote of the Day (12.13.25)

“We have performed extensive ground testing by comparing warm up times, full power tethered pulls, and overall temperatures in 100 degree environments against other aircraft >[...]

NTSB Final Report: Gippsland GA-8

While Taxiing To Parking The Right Landing Gear Leg Collapsed, Resulting In Substantial Damage Analysis: The pilot made a normal approach with full flaps and landed on the runway. >[...]

Classic Aero-TV: Historically Unique -- Marlin Horst's Exquisite Fairchild 71

From 2014 (YouTube Edition): Exotic Rebuild Reveals Aerial Work Of Art During EAA AirVenture 2014, ANN's Michael Maya Charles took the time to get a history lesson about a great ai>[...]

Airborne 12.12.25: Global 8000, Korea Pilot Honors, AV-30 Update

Also: Project Talon, McFarlane Acquisition, Sky-Tec Service, JPL Earth Helo Tests Bombardier has earned a round of applause from the business aviation community, celebrating the fo>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC