And Then There Were Three ... Dreamliners Flying | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Feb 26, 2010

And Then There Were Three ... Dreamliners Flying

Boeing's ZA004 Joins 787 Flight-Test Program

A third airplane has joined the Boeing 787 Dreamliner flight-test program. ZA004, the fourth flight-test airplane to be built, took off at 1143 PST local time Wednesday from Paine Field in Everett, WA. The program plan called for ZA004 to fly before ZA003 because the data ZA004 is collecting is needed more quickly both for certification and development of the 787-9.

Captains Heather Ross and Craig Bomben completed a three-hour-and-two-minute flight at 2:45 p.m., landing at Boeing Field in Seattle. Flight-test personnel were also on board to monitor airplane performance. "Airplane No. 4 operated flawlessly today," Ross said after landing. "We've got a lot of work ahead of us but I can't imagine a better start to the flight test program for this airplane."

Ross will serve as chief pilot for ZA004. This airplane will be used to accomplish the following types of tests: aerodynamics, high-speed performance, propulsion performance, flight loads, community noise and extended operations (ETOPS) and other test conditions.

During Wednesday's flight, the airplane reached an altitude of 30,000 feet and an airspeed of 255 knots. As the testing of the 787 fleet progresses, the airplane will fly at its expected in-service maximum altitude of 40,000 feet and speed of Mach 0.85.

"We are continuing to make good progress on the flight test program," said Scott Fancher, vice president and general manager of the 787 program, Boeing Commercial Airplanes. "The team is staying focused and disciplined in keeping the priority on safety and execution of the plan."

FMI: www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (11.14.25): Marker Beacon

Marker Beacon An electronic navigation facility transmitting a 75 MHz vertical fan or boneshaped radiation pattern. Marker beacons are identified by their modulation frequency and >[...]

Aero-News: Quote of the Day (11.14.25)

“Aviation is an incredible tool for Samaritan’s Purse. After a disaster strikes, we want people to know why we are bringing life-saving supplies. We want them to know t>[...]

Classic Aero-TV: CiES All-Digital Fuel Senders

From 2024 (YouTube Edition): New Capabilities For Business Aviation CiES Corporation President Scott Philiben walked Aero-News Editor in Chief Jim Campbell through some of what set>[...]

Airborne 11.10.25: Affordable Expo Succeeds, Citation Ascend, Kenai Shuts Down

Also: Duffy Predicts ‘Mass Chaos’, Modern Skies Coalition, More Impacts, Archer Buys Hawthorne With only a few months of preparation—and minimal outside media sup>[...]

NTSB Final Report: Lancair 320

The Experienced Pilot Chose To Operate In Instrument Meteorological Conditions Without An Instrument Flight Rules Clearance Analysis: The airplane was operated on a personal cross->[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC