NASA Engineers Wrap Up Acoustic Testing For SLS | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sun, Sep 07, 2014

NASA Engineers Wrap Up Acoustic Testing For SLS

Five-Percent-Scale Model Helping Determine Likely Sound Levels At Liftoff

Engineers at NASA's Marshall Space Flight Center in Huntsville, Alabama, have wrapped up acoustic testing on a 5-percent scale model of NASA's Space Launch System. The Aug.28 test, the 34th in the series, will help NASA engineers understand how loud the SLS vehicle will be during liftoff. Data from the test series will be used to design the water sound suppression system that reduces liftoff vibrations on the vehicle.  SLS will be the most powerful rocket ever built for deep space missions.

The Scale Model Acoustic test article has four operational liquid engines and two solid rocket motors to represent the propulsion system for SLS. The launch structure also has working water delivery systems to represent its sound suppression system. The test article can be elevated to capture how the liftoff noise changes as the vehicle launches to space. Hot-fire testing began in January and will end this fall.

"We have almost completed testing to encompass all of the liftoff noise levels SLS could experience during launch," said Jeremy Kenny, SLS acoustics engineer at the Marshall Center, prior to the test. "The latest test will inform us of the liftoff noise levels as the vehicle is positioned approximately 150 feet above the deck that the model is positioned on."

"This has been a very successful test program," Kenny added. "Not only has our team gotten a better understanding of the noise levels expected at launch, but we've also proven out the effectiveness of the water suppression systems currently being installed at NASA's Kennedy Space Center."

The test program is led by Marshall's Propulsion Department in the Engineering Directorate, with additional engineering support across several NASA centers. The Marshall Center manages the SLS Program for the agency.

(Image provided by NASA)

FMI: www.nasa.gov

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC