Orion Crew Exploration Vehicle Passes Phase 1 Safety Review | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Wed, Jul 07, 2010

Orion Crew Exploration Vehicle Passes Phase 1 Safety Review

Spacecraft Deemed To Meet Critical Human Space Flight Requirements

The Orion crew exploration vehicle has successfully completed the Phase 1 Safety Review of NASA's Human Rating Requirements for space exploration in low Earth orbit and beyond. The NASA/Lockheed Martin Orion team earned the approval from NASA's Constellation Safety & Engineering Review Panel (CSERP) upon completion of the review, an essential requirement for the Orion program to move forward to the Critical Design Review and Phase 2 Safety Review.

The safety review process is a rigorous and exhaustive look at the design and operational concepts to assure that all requirements have been adequately met. System safety requirements address potentially catastrophic failures that could result in loss of crew or loss of mission during launch, ascent to orbit, approach and docking to the International Space Station, re-entry, landing, and recovery operations. Thoroughly reviewing spacecraft designs and operations for possible causes of such catastrophic failures, and designing appropriate mitigations for them, is a critical part of NASA's human rating program.


Orion Crew Module Under Construction

"Completing this significant safety review puts Orion well down the road in satisfying the requirements to minimize the nation's gap in human space flight," said Paul Benfield, Lockheed Martin Integrated Reliability & Safety Manager for the Orion Program. "NASA's current human rating standards include stringent requirements and thorough procedures developed from the best practices of NASA's past 50 years of human spaceflight."

Benfield noted that human rating a vehicle for beyond low Earth orbit (LEO) is particularly challenging given the greater autonomy of such a mission, the extended mission durations, and increased time to return to Earth. This Phase 1 Safety milestone covers the requirements for Orion missions in LEO as well as sortie missions to the moon. The design enables a six-month on-orbit duration which is vital to assure return capability of the space station crew, as well as support autonomous lunar orbit operations. This long duration design far exceeds the one- to two-week capabilities offered by other potential providers.


Artist's Rendering

"Human rating a spacecraft is not a feature you can just simply add on once the vehicle is designed," explained Benfield. "It is a process that requires endurance and attention to detail to ensure that safety is driven into every aspect of the vehicle design and operations from the beginning. Optimal safety and reliability is strategically and systematically incorporated into the vehicle from day one, concurrent with critical trade decisions considering vehicle mass and cost."

FMI: www.nasa.gov, www.lockheedmartin.com

Advertisement

More News

ANN's Daily Aero-Term (04.25.24): Airport Rotating Beacon

Airport Rotating Beacon A visual NAVAID operated at many airports. At civil airports, alternating white and green flashes indicate the location of the airport. At military airports>[...]

ANN's Daily Aero-Linx (04.25.24)

Aero Linx: Fly for the Culture Fly For the Culture, Inc. is a 501(c)(3) non-profit organization that serves young people interested in pursuing professions in the aviation industry>[...]

Klyde Morris (04.22.24)

Klyde Is Having Some Issues Comprehending The Fed's Priorities FMI: www.klydemorris.com>[...]

Airborne 04.24.24: INTEGRAL E, Elixir USA, M700 RVSM

Also: Viasat-uAvionix, UL94 Fuel Investigation, AF Materiel Command, NTSB Safety Alert Norges Luftsportforbund chose Aura Aero's little 2-seater in electric trim for their next gli>[...]

Airborne 04.22.24: Rotor X Worsens, Airport Fees 4 FNB?, USMC Drone Pilot

Also: EP Systems' Battery, Boeing SAF, Repeat TBM 960 Order, Japan Coast Guard H225 Buy Despite nearly 100 complaints totaling millions of dollars of potential fraud, combined with>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC