FAA Proposes $425,000 Civil Penalty Against Gulfstream | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.22.24

Airborne-Unlimited-04.16.24

Airborne-FlightTraining-04.17.24 Airborne-AffordableFlyers-04.18.24

Airborne-Unlimited-04.19.24

Join Us At 0900ET, Friday, 4/10, for the LIVE Morning Brief.
Watch It LIVE at
www.airborne-live.net

Fri, Sep 19, 2014

FAA Proposes $425,000 Civil Penalty Against Gulfstream

Alleges Failure To Properly Train Aircraft Mechanics

The FAA is proposing a $425,000 civil penalty against Gulfstream Aerospace Corp., for failing to comply with Federal Aviation Regulations (FAR) related to training aircraft mechanics.

An FAA inspection determined that some mechanics did not complete required training within time limits established in its FAA-approved training manual, and they missed numerous training deadlines. Additionally, after reviewing employee training records, FAA inspectors could not determine whether some of the employees completed training, or whether the records were inaccurate. The FAA also alleges that Gulfstream allowed mechanics to maintain aircraft when they had not completed required training.
 
FAA inspections in November 2009 and March 2010 initially identified the training discrepancies. During a June 2010 follow-up inspection, the FAA determined that Gulfstream’s corrective actions were insufficient to address systemic training and recordkeeping issues.
 
“Training is a critical component of a safe aviation system,” said FAA Administrator Michael Huerta. “Operators must ensure that mechanics meet all FAA training requirements before working on complex jet aircraft.”

The FAA alleges that the violations compromised safety since mechanics maintained aircraft without receiving required recurrent training.
 
Gulfstream Aerospace Corp. has 30 days from the receipt of the FAA’s Civil Penalty letter to respond to the agency.

FMI: www.faa.gov, www.gulfstream.com

Advertisement

More News

ANN's Daily Aero-Term (04.24.24): Runway Lead-in Light System

Runway Lead-in Light System Runway Lead-in Light System Consists of one or more series of flashing lights installed at or near ground level that provides positive visual guidance a>[...]

ANN's Daily Aero-Linx (04.24.24)

Aero Linx: Aviation Without Borders Aviation Without Borders uses its aviation expertise, contacts and partnerships to enable support for children and their families – at hom>[...]

Aero-FAQ: Dave Juwel's Aviation Marketing Stories -- ITBOA BNITBOB

Dave Juwel's Aviation Marketing Stories ITBOA BNITBOB ... what does that mean? It's not gibberish, it's a lengthy acronym for "In The Business Of Aviation ... But Not In The Busine>[...]

Classic Aero-TV: Best Seat in The House -- 'Inside' The AeroShell Aerobatic Team

From 2010 (YouTube Version): Yeah.... This IS A Really Cool Job When ANN's Nathan Cremisino took over the lead of our Aero-TV teams, he knew he was in for some extra work and a lot>[...]

Airborne Affordable Flyers 04.18.24: CarbonCub UL, Fisher, Affordable Flyer Expo

Also: Junkers A50 Heritage, Montaer Grows, Dynon-Advance Flight Systems, Vans' Latest Officially, the Carbon Cub UL and Rotax 916 iS is now in its 'market survey development phase'>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC