LM Awarded $158.5 Million Upgrade Contract For German P-3C Orion Aircraft | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Mon, Nov 06, 2017

LM Awarded $158.5 Million Upgrade Contract For German P-3C Orion Aircraft

Represents Second Phase Of The German Navy Mission System Refresh Program

Lockheed Martin has received a $158.5 million contract for the second phase of the German Navy P-3C Mission System Refresh program. The program will upgrade the mission system processing suites on the fleet of eight P-3C Orion maritime patrol aircraft to support operations through 2035. The Mission System Refresh is part of an overall fleet upgrade that includes structural mid-life upgrades as well as an upgrade to the Instrument Flight Rules (IFR) cockpit capability.

The German P-3C Orion Mission System Refresh Program will include the design, development, manufacture, integration, installation and test of the Lockheed Martin Airborne Tactical Mission System. The majority of the hardware and software design, manufacture and upgrades will be performed at Lockheed Martin sites in Owego, New York, Manassas, Virginia and Marietta, GA.

"The P-3 Orion has been the world standard in maritime surveillance for over 50 years.  Lockheed Martin is dedicated to providing solutions and critical needs that our U.S. Navy and international customers rely on to carry out these critical missions," said Mike McGuire, Lockheed Martin Rotary and Mission Systems Germany P-3 program manager. "The Mission System Refresh provides critical surveillance capabilities, reduces hardware footprint and supports continued future system sustainment."

The Airborne Tactical Mission System is an Open Architecture JAVA-based system that provides state-of-the-art software programs as well as core mission system processing, display and control components.  By leveraging Commercial-Off-The-Shelf (COTS) components, future obsolescence costs are reduced thereby supporting the long-term system sustainability for the customer.  In addition to the Airborne Tactical Mission System, the Mission System Refresh will include a new acoustic processing system called the Airborne Rack-Mounted Commercial Portable Processor (AR-C2P) that will provide long-term sustainability in the P-3 aircraft.

The Germany P-3 Orion Mission System Refresh Program began in 2016 when the U.S. Navy awarded Lockheed Martin an initial Foreign Military Sales (FMS) contract for $54.9 million for design and development work through Preliminary Design. This current contract award of $158.5 million takes the program from Preliminary Design Review through program completion in 2022.  The eight aircraft operated by the German Navy were procured in early 2006 from the Royal Netherlands Navy. The P-3 boasts a number of international customers; a number of whom envision operating their aircraft through 2040.

(Image provided with Lockheed Martin news release)

FMI: www.lockheedmartin.com

Advertisement

More News

NBAA Responds To GA/BA Operational Restrictions

Bolen Issues Statement Reinforcing Need To Reopen Government The National Business Aviation Association’s President and CEO issued the statement below in response to further >[...]

Boeing Deliveries Surge to Pre-Pandemic Levels

Output May Reach Its Best Since 2018 Despite Trailing Behind Airbus Boeing delivered 53 jets in October, bringing its 2025 total to 493 aircraft and marking its strongest output si>[...]

Spirit Forecasts Financial Turbulence

Low-Cost Airline Admits “Substantial Doubt” It Can Stay Airborne Spirit Airlines has once again found itself in financial trouble, this time less than a year after clai>[...]

Singapore Adds a Price Tag to Going Green

Travelers Leaving Changi Will Soon Pay for Sustainable Fuel Starting April 2026, passengers flying out of Singapore will find a new fee tucked into their tickets: a Sustainable Avi>[...]

NTSB Final Report: Arlie L Raber III Challenger 1

Pilot Was Having Difficulty Controlling The Airplane’S Rudder Pedals Due To His Physical Stature Analysis: The pilot was having difficulty controlling the airplane’s ru>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC