FAA Grants Pro Star Precision Machining PMA Approval | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sat, Sep 14, 2019

FAA Grants Pro Star Precision Machining PMA Approval

Will Allow Pro Star Aviation To Manufacture Certified Parts And Kits

Pro Star Precision Machining, a subsidiary of Pro Star Aviation, has received Parts Manufacturer Approval (PMA) certificate number PQ10043NE from the FAA. PMA is a design and production approval for the modification and replacement of articles for type certificated parts and products.

This new approval will allow Pro Star Aviation to manufacture certified parts and kits to sell for use on OEM, Special Missions, Commercial, and Government platforms. "Pro Star quickly recognized the need to provide solutions for complex installations and source hard to locate high-cost piece parts for aging aircraft," stated Sean Peterson, General Manager of Pro Star Aviation. "The ability to bring these capabilities in-house will save our customers time and money and increase the level of quality assurance on parts.”

In addition to selling parts for their own STC’s, Pro Star Aviation will now have the ability to collaborate with organizations that have achieved STC’s but do not have the resources to produce parts or create kits.  “We’ve produced low-quantity, specialized piece parts for over 18 years,” stated Brian Cote, President of Pro Star Precision Machining, “Achieving PMA certification will expand our Global Market reach and the ability to offer high-quality aviation parts to reduce time and costs.”

(Source: Pro Star news release)

FMI: www.prostarmachine.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC