First Flight: Epic Aircraft E1000 Prototype | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.01.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-AffordableFlyers-11.20.25

AirborneUnlimited-11.21.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Dec 25, 2015

First Flight: Epic Aircraft E1000 Prototype

Chief Pilot Says Airplane 'Performed Just As Expected'

The Epic E1000 prototype FT1, sporting tail number N331FT, took its first flight on December 19th, at approximately 1600 local time from the Bend Municipal Airport (KBDN). Upon completion of the scheduled 20 minute flight, Epic Chief Pilot, David Robinson, reported “The aircraft handled extremely well and performed just as expected.”

 

“This is a tremendous accomplishment and I couldn’t be more proud of our team. We achieved our goal to fly FT1 by the end of the year, thanks to the hard work, long hours and dedicated commitment of our entire staff. The timing just before Christmas gives us even more to celebrate this holiday season,” adds Epic CEO, Doug King.
 
FT1 testing will continue over the next several months, assessing general handling qualities, operational performance, systems operations in normal mode, failure scenarios, extreme conditions, and Flight Into Known Icing (FIKI) regulations.
 
The second and final flight test article, FT2, is scheduled to launch this spring, and will reflect as closely as possible the E1000 production aircraft, both in equipment and manufacturing process. FT2 testing will focus on assessing interior and cabin functionality, including fuel, hydraulic, avionics, navigational and environmental systems.
 
The E1000 design perfectly addresses the market need for a high speed, low-cost aircraft that can efficiently support individual owner pilots, as well as corporate, fractional and charter operations. The company expects the E1000 to be a formidable competitor in the single-engine turboprop market, as well as offer business jet owners a more versatile, lower-cost platform.

“Traditional metal aircraft are at a tremendous disadvantage. Carbon fiber is lighter, stronger, more aerodynamic and less expensive to manufacture, providing more speed, range, payload, and performance at a highly competitive price. That’s why the E1000 will be the fastest, most versatile and affordable, six-place single-engine turboprop in the world,” says King.
 
Competitively priced at $2.95 million ‘fully-equipped’, the E1000 all-composite airframe, powered by the 1200-horsepower Pratt & Whitney PT6A-67A turbine engine, travels at speeds over 325 KTAS, offering a range of 1,650 nautical miles, climb rate over 4,000 feet per minute, authorized ceiling of 34,000 feet, and full fuel payload of 1,120 pounds.

(Source: Epic Aircraft news release. Image from provided YouTube video)

FMI: www.epicaircraft.com

Advertisement

More News

Classic Aero-TV: VerdeGo Debuts VH-3 Hybrid-Electric Powerplant

From 2023 (YouTube Edition): New Propulsion Scheme Optimized for AAM Applications Founded in 2017 by Eric Bartsch, Pat Anderson, and Erik Lindbergh (grandson of famed aviation pion>[...]

NTSB Prelim: Grumman American Avn. Corp. AA-5B

During The Initial Climb, The Engine Began To Operate Abnormally And, After About Three Seconds, Experienced A Total Loss Of Power On October 29, 2025, about 1820 Pacific daylight >[...]

ANN's Daily Aero-Linx (12.02.25)

Aero Linx: Women in Aviation International Women in Aviation International is the largest nonprofit organization that envisions a world where the sky is open to all, and where avia>[...]

Aero-News: Quote of the Day (12.02.25)

“We’ve paid for the cable line’s repair for the customer and have apologized for the inconvenience this caused them...” Source: Some followup info from an A>[...]

Aero-News: Quote of the Day (12.03.25)

“We have long warned about the devastating effects of pairing optimization. Multiple times over many months, we highlighted how schedule manipulation, unbalanced schedules, a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC