International Space Station Status Report: Planning a Spacewalk | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.02.25

Airborne-Unlimited-12.03.25

Airborne-FltTraining-12.04.25

AirborneUnlimited-12.05.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Apr 25, 2004

International Space Station Status Report: Planning a Spacewalk

Report #22, 3 p.m. CDT, Friday, April 23, 2004

New crewmembers aboard the International Space Station settled into a routine of handover briefings and scientific experiments after their arrival early Wednesday.

Expedition 9's Commander Gennady Padalka and NASA ISS Science Officer Mike Fincke docked their ISS Soyuz 8 spacecraft to the nadir port of the Zarya Control Module at 12:01 a.m. CDT Wednesday. They opened hatches and boarded the station about an hour later, beginning a six-month stay.

With them on the Soyuz was European Space Agency Astronaut Andre Kuipers of the Netherlands, who will spend nine days aboard the Station conducting scientific investigations. Kuipers will return to Earth with Expedition 8's Commander Michael Foale and Flight Engineer Alexander Kaleri. Foale and Kaleri arrived on the Station last October 20.

Their ISS Soyuz 7 capsule is scheduled to undock from the Station's Pirs Docking Compartment, where it has been during Expedition 8's stay on the Station, at 3:52 p.m. CDT April 29. The landing is scheduled for 7:10 p.m. CDT the same day on the steppes of Kazakhstan.

Early Thursday, during their Daily Planning Conference, crewmembers were told that one of the Station's three operating Control Moment Gyroscopes, CMG 2, had gone off line at about 3:20 p.m. CDT on Wednesday. The CMGs (shown below) use power from the solar arrays to control the Station's orientation. Flight controllers traced the problem to a Remote Power Controller Module (RPCM), a kind of remotely controlled circuit breaker, that had malfunctioned and cut off power to the gyroscope. The RPCM is mounted on the top of the Station's central truss segment, above the U.S. Laboratory Destiny.

Two CMGs continue to operate well and are sufficient for controlling the Station's orientiation until the RPCM can be replaced. Flight controllers have begun planning a spacewalk that will likely be conducted sometime in the next month to replace the RPCM with a spare unit and restore operation of CMG-2. A spare RPCM is aboard the Station.

FMI: http://spaceflight.nasa.gov, http://scipoc.msfc.nasa.gov

Advertisement

More News

NTSB Final Report: Patriot Aircraft LLC CX1900A

After Draining Both Wing Fuel Tanks, A Significant Amount Of Water Was Observed In The Right Wing Fuel Tank Analysis: The pilot, who was also the owner of the experimental amateur->[...]

Aero-News: Quote of the Day (12.06.25)

“Airbus apologises for any challenges and delays caused to passengers and airlines by this event. The Company thanks its customers, the authorities, its employees and all rel>[...]

ANN's Daily Aero-Term (12.06.25): High Speed Taxiway

High Speed Taxiway A long radius taxiway designed and provided with lighting or marking to define the path of aircraft, traveling at high speed (up to 60 knots), from the runway ce>[...]

ANN's Daily Aero-Linx (12.06.25)

Aero Linx: Taylorcraft Foundation, Inc. The Taylorcraft Foundation is exclusively organized for charitable, educational & scientific activities and will preserve the history an>[...]

Airborne-NextGen 12.02.25: Honda eVTOL, Arctus High-Alt UAS, Samson Patent

Also: USAF Reaper Accident, Baikonur Damage, Horizon eVTOL IFR/FIKI, New Glenn Update Honda has outlined its clearest timeline yet for its entry into the world of electric vertical>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC