Army Grounds Chinook, Honeywell Solves the Case | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-04.28.25

Airborne-NextGen-04.29.25

AirborneUnlimited-04.30.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Sep 01, 2022

Army Grounds Chinook, Honeywell Solves the Case

Uh-Oh... Turns Out it IS Important to Use Factory-Approved O-Rings!

The Army issued a surprising grounding order earlier this week, halting flight operations for more than 400 Chinook helicopters over an issue that could lead to engine fires. 

In a statement, Cynthia Smith said the Army encountered an unspecified number of fuel leaks that lead to engine fires, leading to the fleet being held on pause until the issue could be diagnosed. No injuries were reported, and some reports placed the number of problem aircraft around 70 helicopters in total.

Honeywell, probably eager to correct the record and clear itself of any fault after 60 years of Chinook support, was able to track down the source of the problems soon after the order was given. The manufacturer, sure that the problem was out of the norm for the longstanding and generally reliable T-55 engine, began a joint investigation with the US Army to get to the bottom of things. 

The result? That some engines had been overhauled and refurbished with O-rings outside of Honeywell specification...while under maintenance by Army Depot personnel. The suspect O-rings have been identified and isolated to minimize the possibility of installation, with all relatively pleased that they could restore the T-55's good name.

Honeywell embarked on an effort alongside the Army to address the issue and provide suitable replacement O-rings on all affected Chinooks. The issue does highlight the susceptibility of supply chains in recent years, as a never ending parade of delays, mistakes, backorders, and substitutions continue to take their toll on a weary industry trying to keep the aircraft taking off on time. Honeywell was careful to note that the O-rings aren't theirs, coming from the mysterious ether of cheap, shoddy products offering their siren call to quartermasters everywhere.

Sadly for the spendthrift team, this round goes in favor of those who insist on using "Honeywell Approved O-Rings". 

FMI: www.honeywell.com, www.army.mil 

Advertisement

More News

Aero-News: Quote of the Day (04.28.25)

“While legendary World War II aircraft such as the Corsair and P-51 Mustang still were widely flown at the start of the Korean War in 1950, a new age of jets rapidly came to >[...]

ANN's Daily Aero-Term (04.28.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

ANN's Daily Aero-Linx (04.28.25)

Aero Linx: National Aviation Safety Foundation (NASF) The National Aviation Safety Foundation is a support group whose objective is to enhance aviation safety through educational p>[...]

Airborne-Flight Training 04.24.25: GA Refocused, Seminole/Epic, WestJet v TFWP

Also: Cal Poly Aviation Club, $$un Country, Arkansas Aviation Academy, Teamsters Local 2118 In response to two recent general aviation accidents that made national headlines, more >[...]

Aero-News: Quote of the Day (04.29.25)

“The FAA is tasked with ensuring our skies are safe, and they do a great job at it, but there is something about the system that is holding up the medical process. Obviously,>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC