NASA Administrator Visits Marshall, Views Space Launch System Progress | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Mar 18, 2014

NASA Administrator Visits Marshall, Views Space Launch System Progress

Avionics Testing Underway For SLS Boosters

NASA Administrator Charles Bolden toured on March 14 the agency's Marshall Space Flight Center in Huntsville, AL where testing is underway on the avionics unit for the agency's Space Launch System (SLS). The avionics unit -- including its hardware, software and operating systems -- will guide the rocket to deep space destinations. The flight computers will be housed in the SLS core stage, while other avionics are distributed throughout the vehicle.

At Marshall's System Integration Laboratory, Bolden, along with staff from Alabama's congressional delegation and community leaders, had the opportunity to view the SLS avionics unit arranged in flight configuration, along with booster hardware, which are being integrated and tested together to ultimately guide the entire vehicle. He also watched flight software simulations of how SLS will perform during launch.

"It’s great to be back at Marshall and see, firsthand, the impressive progress made by the SLS team,” said Bolden. "SLS will help take American astronauts an asteroid and Mars, and it all starts here in Huntsville. My hat's off to the entire team for their hard work." The completed rocket will stand 321 feet tall and include the core stage, which stores the cryogenic liquid hydrogen and liquid oxygen that will fuel the vehicle's four RS-25 engines and, with two five-segment solid rocket boosters, power the rocket.

Engineers from NASA and Boeing, the prime contract for the SLS core stage and avionics, integrated and powered up the core stage avionics unit for its initial run, called "First Light," in early January and have since been running numerous tests using the latest flight software. "This is a significant and exciting milestone for both NASA and Boeing," said Lisa Blue, stages avionics system manager in the SLS Program Office. "We are using and testing technologies that include the most powerful computer processor ever used in a flight system."

In 2015, the avionics unit will be shipped to NASA’s Michoud Assembly Facility in New Orleans, where the core stage is being manufactured, and attached to the actual rocket.

For its first flight test in 2017, the SLS will be configured to lift 70 metric tons (77 tons), and carry an uncrewed Orion spacecraft beyond low-Earth orbit. In its final stage of evolution, the SLS will provide an unprecedented lift capability of 130 metric tons to enable missions even farther into our solar system.

FMI: www.nasa.gov/sls

Advertisement

More News

Aero-News: Quote of the Day (11.17.25)

“We achieved full mission success today, and I am so proud of the team. It turns out Never Tell Me The Odds had perfect odds—never before in history has a booster this >[...]

ANN's Daily Aero-Term (11.17.25): NonDirectional Beacon

NonDirectional Beacon An L/MF or UHF radio beacon transmitting nondirectional signals whereby the pilot of an aircraft equipped with direction finding equipment can determine his/h>[...]

NTSB Final Report: Fred L Wellman CH 750 Cruzer

About 5ft Above Ground Level, The Airplane Stalled, And The Left Wing Dropped Analysis: The pilot reported that this flight was conducted as part of phase 1 flight testing of the n>[...]

ANN's Daily Aero-Linx (11.17.25)

Aero Linx: Brodhead Pietenpol Association The Brodhead Pietenpol Association is a newly reorganized (in 2017) non-profit educational corporation that grew and developed from an ear>[...]

Airborne-NextGen 11.11.25: Archer Buys Hawthorne, Joby Conforms, Stranded Astros

Also: VerdeGo Contract, Medi-Carrier, Gambit 6 UCAV, Blade Urban Air Mobility Pilot Archer Aviation has inked a deal for control of Hawthorne Municipal Airport (HHR), also known as>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC