Draco Aircraft Gears Up for New Hyper-STOL | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Mon, Nov 11, 2024

Draco Aircraft Gears Up for New Hyper-STOL

PZL-104 Wilga Revived as Next-Gen Turbine-Powered Draco

Draco Aircraft is aiming to raise $4.5 million to fund the development of its hyper short takeoff and landing (STOL) device, the Draco. This aircraft is a reinvention of the out-of-production PZL-104 Wilga.

Airbus Poland ceased production of the Wilga STOL utility aircraft in 2006, and signed over rights in September. Draco Aircraft will now be able to produce the next-gen, turbine powered version, dubbed Draco. The manufacturer hopes to bring the development to the market in 2028.

The Draco’s initial modification, completed by Mike Patey (who reports that he is not a part of this effort outside of his appreciation for what they are trying to do), was first introduced at the 2018 EAA Oshkosh Airventure. Though the original design was destroyed in a crash, it logged impressive performance characteristics. It has a takeoff distance of less than 100 feet, a stall speed of just 38 knots, and a climb rate of 4,000 feet per minute. It will be powered by a Pratt & Whitney PT6A turboprop and a 102-inch, five-blade MT propeller.

Draco plans to combine the original Wilga design with Patey’s updates to apply for Part 23 type certification with EASA and the FAA, with additional support from the Polish Institute of Aviation.

Though details are not set in stone, manufacturing of the Draco will likely take place in Poland, with final assembly for the North American market being developed at Utah’s Spanish Fork-Springville Airport.

The funds raised from this $4.5 million round will support Draco’s application for EU technology development funding, which could keep the company’s work moving until 2027. This is when Draco plans to complete a production-conforming prototype.

The initial turboprop-powered Draco will have an estimated range of 900 nautical miles. In the longer term, Draco aims to develop an electric version, called the "Green Draco." However, the electric aircraft's development will be on hold until electric propulsion technology advances.

Draco is positioning the aircraft for private, commercial, and defense applications due to its exceptional STOL capabilities.

FMI: www.dracoaircraft.com

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC