1st P-8A Poseidon Production Aircraft Delivered To The Navy | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Thu, Mar 08, 2012

1st P-8A Poseidon Production Aircraft Delivered To The Navy

Aircraft Handed Over March 4 In Seattle, Flies To Jacksonville, FL

The first production P-8A Poseidon aircraft was handed over to the U.S. Navy in Seattle late last week. The P-8A is the first of 13 anti-submarine warfare, anti-surface warfare, intelligence, surveillance and reconnaissance aircraft Boeing will deliver as part of a low-rate initial production (LRIP) contract awarded in 2011.

“Delivering this capability to the warfighter is the ultimate goal and we’re proud to be able to meet our commitment and hand over the P-8A ‘keys’ to the Navy fleet,” said Chuck Dabundo, Boeing vice president and P-8 program manager. “This is a great day for Boeing, our supplier teammates and our Navy customer.”

“The Navy fleet is more than ready to receive the P-8A, which will provide the users and operators a step increase in mission capabilities,” said Rear Admiral Paul Grosklags, U.S. Navy Program Executive Officer for Air Anti-Submarine Warfare, Assault & Special Mission Programs. “Thanks to Boeing and the entire team for its efforts and great partnership to date.”
 
Following delivery in Seattle, Navy pilots flew the first production P-8A, LRIP1-1, to Naval Air Station Jacksonville, FL, where it will be used for aircrew training.
 
The Poseidon team is using a first-in-industry in-line production process that draws on Boeing’s Next-Generation 737 production system. All P-8A-unique aircraft modifications are made in sequence during fabrication and assembly. Along with production aircraft, the P-8A team also has built and is testing six flight-test and two ground-test aircraft. The flight-test aircraft are based at Naval Air Station Patuxent River, Md., and have completed more than 1,500 flight hours.
 
The Navy plans to purchase 117 Boeing 737-based P-8A aircraft to replace its P-3 fleet. Initial operational capability is planned for 2013. (US Navy Photo)

FMI: www.navy.mil, www.boeing.com

Advertisement

More News

ANN's Daily Aero-Term (05.07.25): Terminal Radar Service Area

Terminal Radar Service Area Airspace surrounding designated airports wherein ATC provides radar vectoring, sequencing, and separation on a full-time basis for all IFR and participa>[...]

ANN's Daily Aero-Linx (05.07.25)

Aero Linx: Utah Back Country Pilots Association (UBCP) Through the sharing experiences, the UBCP has built upon a foundation of safe operating practices in some of the most challen>[...]

Classic Aero-TV: Anousheh Ansari -- The Woman Behind The Prize

From 2010 (YouTube Edition): Imagine... Be The Change... Inspire FROM 2010: One of the more unusual phone calls I have ever received occurred a few years ago... from Anousheh Ansar>[...]

NTSB Prelim: Bell 206B

(Pilot) Felt A Shudder And Heard The Engine Sounding Differently, Followed By The Engine Chip Detector Light On April 14, 2025, about 1800 Pacific daylight time, a Bell 206B, N1667>[...]

Airborne-NextGen 05.06.25: AF Uncrewed Fighters, Drones v Planes, Joby Crew Test

Also: AMA Names Tyler Dobbs, More Falcon 9 Ops, Firefly Launch Unsuccessful, Autonomous F-16s The Air Force has begun ground testing a future uncrewed jet design in a milestone tow>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC