ispace Readies HAKUTO-R for Launch | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Jul 03, 2024

ispace Readies HAKUTO-R for Launch

Japanese Spacecraft Provider Readies for Mission 2

Japanese space developer ispace, inc announced the completion of the HAKUTO-R Mission 2 RESILIENCE lunar lander, planning for a launch this Winter.

The HAKUTO name may seem familiar to those who recall ispace's work on the little Moonraker rover, a cute little thing that paved the way for bigger and better things like their banner project, the HAKUTO-R. The new unit demanded a host of testing and checks before they could give it the go-ahead for flight, which produced no shortage of information for the team to review. The firm was chosen by NASA to undertake a mission aimed at snatching up some samples of lunar regolith from the surface of the Moon, a fairly involved process requiring the use of a lander and rover system. The tiny rover will deploy and gather a small sample of lunar rock, and photograph, assess, and analyze its composition. That will help mission planners back on Earth as they look to future operations, knowing what the easiest minerals and elements are to access.

Their most recent checkouts included a stint in the thermal vacuum testing chamber, assessing how the satellite will fare in the extreme temp swings that orbiters endure. A simulated spaceflight showed that the HAKUTO-R was able to function under every environmental condition the team could put it up against, retaining full functionality of power systems, guidance, navigation and control (GNC) equipment, radio communications, and thermal control gear. Engineers at ispace are now delving into the data gleaned from the simulated ops, applying lessons learned to future satellite tests.

“I am grateful for the efforts of ispace’s employees as the RESILIENCE lunar lander has achieved another significant testing milestone in preparation for Mission 2,” said Takeshi Hakamada, Founder and CEO of ispace. "Conducting multiple missions in relatively short intervals has improved the maturity of our team and the technology itself. We are dedicated to mission success and will continue to work towards realizing our vision of high-frequency, low-cost lunar transportation services.”

“The successful completion of the thermal vacuum test for Mission 2 was a great achievement. I am proud of the efforts of the team involved in this operation by improving the process based on our experience from Mission 1 and the lander performed well, as we expected,” said Ryo Ujiie, CTO of ispace. “The RESILIENCE lander is quickly moving towards final preparations for launch and we are pleased with progress.”

With HAKUTO-R loaded in the chamber, ispace can now look onward to its Series 3 lander, expected to launch in 2026.

FMI: www.ispace-inc.com

Advertisement

More News

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

ANN's Daily Aero-Linx (11.20.25)

Aero Linx: Glenn H. Curtiss Museum The Glenn H. Curtiss Museum, bearing the name of Hammondsport’s favorite son, is located on State Route 54, one half mile south of the vill>[...]

NTSB Prelim: Just Highlander

The Flight Instructor Noticed Some Engine Roughness And Diverted Toward Westwinds Airport On November 2, 2025, about 1630 mountain standard time, an experimental amateur-built Just>[...]

Classic Aero-TV: Just Like The 'Real' Thing – Redbird/Disney’s ‘Dusty’ FlightSim

From 2014 (YouTube Edition) -- Disclaimer: No Matter What He Tells You, Tom Is Not A Certified Firefighting Pilot While at EAA AirVenture 2014, ANN News Editor, Tom Patton checked >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC