UAV Package Delivery Not Far Off | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Wed, Jan 22, 2003

UAV Package Delivery Not Far Off

First Test Successful

Northrop Grumman Corporation's Integrated Systems sector has conducted the first flight demonstration of an unmanned air vehicle (UAV) system designed to employ a fully-autonomous UAV to deliver a variety of payload packages to multiple, preprogrammed locations.

Developed and demonstrated within an eight-week period, the system is derived from the highly successful, reliable BQM-34 Firebee aerial target. The 36-minute flight, conducted Dec. 20, 2002, at an undisclosed Department of Defense test range, demonstrated autonomous navigation, payload carriage and payload deployment followed by successful recovery of the air vehicle.

"This project demonstrated both the versatility of the BQM-34 airframe and the fast reaction development capability in place at the company's Unmanned Systems facility in San Diego," said Al Nikolaus, Northrop Grumman's Firebee program manager.

"This was a team effort, integrating Firebee parts from all three military services built over a period of 30 years plus newly manufactured parts and modern, autonomous navigation systems," said Doug Fronius, Northrop Grumman's director for Targets programs.

The project was developed at the Integrated Systems sector's Unmanned Systems unit in San Diego. System modifications included integrating 1970s-era AQM-34L bomb rack-equipped wings with BQM-34S Firebee targets currently produced. Large composite payload pods manufactured for Northrop Grumman by Grove Aircraft (El Cajon, CA) were designed and integrated onto the air vehicle. In addition, a portable range safety flight termination system was integrated to allow system testing at a non-target test range facility.

Software was modified to provide fully autonomous mission capability, payload deployment and ground control station integration. Finally, the system was tested "end to end" at the program's system integration center facility.

FMI: www.northropgrumman.com

Advertisement

More News

NBAA Responds To GA/BA Operational Restrictions

Bolen Issues Statement Reinforcing Need To Reopen Government The National Business Aviation Association’s President and CEO issued the statement below in response to further >[...]

Boeing Deliveries Surge to Pre-Pandemic Levels

Output May Reach Its Best Since 2018 Despite Trailing Behind Airbus Boeing delivered 53 jets in October, bringing its 2025 total to 493 aircraft and marking its strongest output si>[...]

Spirit Forecasts Financial Turbulence

Low-Cost Airline Admits “Substantial Doubt” It Can Stay Airborne Spirit Airlines has once again found itself in financial trouble, this time less than a year after clai>[...]

Singapore Adds a Price Tag to Going Green

Travelers Leaving Changi Will Soon Pay for Sustainable Fuel Starting April 2026, passengers flying out of Singapore will find a new fee tucked into their tickets: a Sustainable Avi>[...]

NTSB Final Report: Arlie L Raber III Challenger 1

Pilot Was Having Difficulty Controlling The Airplane’S Rudder Pedals Due To His Physical Stature Analysis: The pilot was having difficulty controlling the airplane’s ru>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC