Chandler Airport May Try Again For Longer Runway | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-SpecialEpisode-12.15.25

AirborneNextGen-
12.16.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Nov 22, 2024

Chandler Airport May Try Again For Longer Runway

Only Airport In Maricopa County Without A 5,000-Foot Runway

The City of Chandler, Arizona, is gearing up to again ask residents to approve a bond request to lengthen a runway at Chandler Municipal Airport (KCHD). They have rejected previous requests but this time the City is giving them the reasons.

Ryan Reeves, the airport director, said at a city council meeting, “We’re answering now, for the first real time, ‘why.’”

Chandler Municipal is the 6th busiest airport in Arizona and the 17th busiest GA airport in the country, averaging about 251,000 operations per year. It is one of just three GA airports in Maricopa County with two runways, but it’s the only one in the county that lacks a 5,000-foot runway.

CHD’s two runways are 4,870 and 4,401 feet, and Reeves said the city should lengthen the longer one to at least 5,550 feet. Reeves stresses that the reason is not to bring in larger aircraft because the pavement is simply not thick enough to support the heavier weight.

Mr. Reeves said, “[They] don’t want airliners to land there, and neither do I. That would destroy your entire airport quite quickly. We could build a runway 12,000 feet long, but I can’t put any bigger aircraft on Chandler Airport than there is now.”

The reason is that during hot weather, which there is no shortage of in Arizona three seasons out of the year, some smaller planes can’t use the runway because high density altitude during hot days require longer takeoff rolls.

To begin the process the city has commissioned a community impact study to analyze the economic impact of the airport and how much the city is losing because of the shorter runway limiting aircraft access during hot weather.

FMI:  www.chandleraz.gov/

Advertisement

More News

ANN's Daily Aero-Term (12.19.25): Ultrahigh Frequency (UHF)

Ultrahigh Frequency (UHF) The frequency band between 300 and 3,000 MHz. The bank of radio frequencies used for military air/ground voice communications. In some instances this may >[...]

NTSB Prelim: Cirrus Design Corp SR22T

During The 7 Second Descent, There Was Another TAWS Alert At Which Time The Engine Remained At Full Power On October 24, 2025 at 2115 mountain daylight time, a Cirrus SR22T, N740TS>[...]

Classic Aero-TV: The Red Tail Project--Carrying the Torch of the Tuskegee Airmen

From 2009 (YouTube Edition): Educational Organization Aims to Inspire by Sharing Tuskegee Story Founding leader Don Hinz summarized the Red Tail Project’s mission in simple, >[...]

Aero-News: Quote of the Day (12.19.25)

“This feels like an important step since space travel for people with disabilities is still in its very early days... I’m so thankful and hope it inspires a change in m>[...]

Airborne 12.17.25: Skydiver Hooks Tail, Cooper Rotax Mount, NTSB v NDAA

Also: New Katanas, Kern County FD Training, IndiGo’s Botched Roster, MGen. Leavitt Named ERAU Dean The Australian Transportation Safety Bureau (ATSB) has wrapped up its inves>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC