ISS Update: Looking Good | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.10.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-Unlimited-11.06.25

AirborneUnlimited-11.07.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Oct 21, 2003

ISS Update: Looking Good

Important Space Event's Coverage Went East Last Week

NASA tells us that things were going as planned aboard the International Space Station, now abuzz with the sounds of voices other than those of Malenchenko and Lu (L, R, in front, below), who have for months been the two loneliest guys in the world... or out of the world, as the case may be.

The International Space Station's newest crew of Expedition 8 Commander Mike Foale and Flight Engineer Alexander Kaleri officially boarded the complex when hatches between its Soyuz spacecraft swung open Monday at 5:19 a.m. CDT ( 1019 GMT, 2:19 p.m. Moscow time). They were joined by visiting researcher, European Space Agency astronaut Pedro Duque.

Greeting them on the station were Expedition 7 Commander Yuri Malenchenko and NASA ISS Science Officer Ed Lu, who are 177 days into their six months in space. The two crews are conducting eight days of joint operations and research before Expedition 7 and Duque return home on October 27.

Among those observing the on orbit arrival of Expedition 8 to the station were NASA Associate Administrator for Space Flight William Readdy and International Space Station Program Manager William Gerstenmaier. Both talked to the five station crew members delivering best wishes for the mission.

The plan for the two crews includes eight days of handover activities and scientific experiments carried out by Duque for Spanish and other European scientists under a commercial contract between ESA and the Russian Aviation and Space Agency.

After lunch Monday, the new crewmembers received a safety briefing from Malenchenko and Lu and installed a seat liner for Duque in the Soyuz that is earmarked for landing October 27 (U.S. time); then they began setting up a host of Duque's equipment previously launched on Russian Progress resupply spacecraft.

The crews went to bed about 3 p.m. CDT Monday and woke up at midnight this morning to begin their first full day of joint operations. Expedition 8 officially will take control of Station operations October 27 when Malenchenko, Lu and Duque close the hatches between their returning Soyuz and the station. Foale and Kaleri will remain on board until late April 2004.

FMI: http://spaceflight.nasa.gov/; http://scipoc.msfc.nasa.gov/

Advertisement

More News

Classic Aero-TV: Mayman Aerospace Speeder Dazzles Oshkosh Crowds

From 2023 (YouTube Edition): A Moniker Well-Chosen Founded in 2021 by serial entrepreneur David Mayman and headquartered in New York City, Mayman Aerospace is the designer and manu>[...]

NTSB Prelim: Socata TBM 700

The Controller Provided The Pilot With A Low Altitude Alert And The Altimeter Setting That Was Current At The Time On October 13, 2025, at about 0815 eastern daylight time, a Socat>[...]

ANN's Daily Aero-Term (11.11.25): Outer Marker

Outer Marker A marker beacon at or near the glideslope intercept altitude of an ILS approach. It is keyed to transmit two dashes per second on a 400 Hz tone, which is received aura>[...]

ANN's Daily Aero-Linx (11.11.25)

Aero Linx: Seaplane Pilots Association The Seaplane Pilots Association is the only organization in the world solely focused on representing the interests of seaplane pilots, owners>[...]

Aero-News: Quote of the Day (11.11.25)

“While business aviation is fully included in the FAA’s traffic reductions, we know that our sector will continue to pursue mandatory and voluntary means to ensure we a>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC