Mississippi Choctaws Ink Deal with AgustaWestland | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-10.20.25

AirborneNextGen-
10.21.25

Airborne-Unlimited-10.22.25

Airborne-FltTraining-10.23.25

AirborneUnlimited-10.17.25

Sat, Jul 03, 2004

Mississippi Choctaws Ink Deal with AgustaWestland

Chief Phillip Martin signs deal to train 500 workers to make wire harnesses

The Mississippi Choctaws have signed an agreement with AgustaWetland to train 500 workers to make wire harnesses for their helicopters. Two manufacturing plants on the Choctaw reservation in Neshoba County may be converted for the project, according to Chief Phillip Martin.

One of the plants was previously producing wiring harnesses for the Ford Motor Company, but the tribe outsourced that work to Mexico over a year ago. The tribe also manufactured radio speakers but that work was also outsourced, to China.

"I believe in the near future most automotive manufacturing jobs will be outsourced," Martin said, in a story published by Forbes Magazine. "This is our chance to convert from low-tech to high-tech manufacturing, which I believe will be the better paying jobs of the future." 

AgustaWestland, the second largest helicopter maker in the world, is competing with Sikorski Aircraft for a contract from the Department of Defense in December for the manufacture of 23 presidential helicopters.

"Workers with automotive experience have the basic skills needed for far more complex aerospace harnesses that function as the helicopters' central nervous system," said AAI Corp. president Frederick Strader. AII signed another agreement with Chief Martin to train the Choctwas to make and use aerospace test equipment. "Frankly, we use so many components bought off-the-shelf that the any large facility can function as a plant once we find the right people."

"Getting qualified to work on aerospace contracts is an exacting process so we see this as a long term commitment, 10 or 15 years at least, to the Choctaws," AgustaWestland president Stpehen Moss said. "It's an entry point for the Choctaws into aerospace contracts."

FMI: www.agustawestland.com, http://www.choctaw.org

Advertisement

More News

Affordable Flying Expo Announces Industry MOSAIC Town Hall

Scheduled for Friday, November 7th at 1800ET, The MOSAIC Town Hall, Webcast At www.airborne-live.net One of the more intriguing features of the 2025 Affordable Flying Expo, schedul>[...]

Classic Aero-TV: Composite-FX Sets Elevates the Personal Helicopter Market

From 2023 (YouTube Edition): The Mosquito Evolves Formerly known as Mosquito, Trenton, Florida-based Composite FX is a designer and manufacturer of personal kit and factory-finishe>[...]

Aero-News: Quote of the Day (10.25.25)

“The Board is pleased to name Lisa as our next CEO after conducting a comprehensive succession planning process and believes this transition will ensure continued success for>[...]

ANN's Daily Aero-Term (10.25.25): Ground Stop (GS)

Ground Stop (GS) The GS is a process that requires aircraft that meet a specific criteria to remain on the ground. The criteria may be airport specific, airspace specific, or equip>[...]

NTSB Final Report: Gallow Daniel A Kitfox Classic IV

The Airplane Stalled Above The Runway Threshold, The Nose Dropped, The Nose Wheel Impacted The Runway, And The Airplane Flipped Over Analysis: The pilot reported that during the fi>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC