Raisbeck’s Learjet 35 ZR Completes Phase II FAA Certification Flight Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-12.08.25

AirborneNextGen-
12.09.25

Airborne-Unlimited-12.10.25

Airborne-AffordableFlyers-12.11.25

AirborneUnlimited-12.12.25

AFE 2025 LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Jan 16, 2004

Raisbeck’s Learjet 35 ZR Completes Phase II FAA Certification Flight Tests

Raisbeck Engineering has completed the aerodynamic flight tests required under FAA TIA (Type Inspection Authorization), necessary to achieve it’s upcoming ZR Technology STC. RVSM qualification testing was also completed.

The FAA flight tests were conducted during the last Quarter of 2003 and completed December 4th. The flights were conducted on S/N 35-634, the same Learjet 35 which was flown over 300 hours in development flight-testing, to define the various elements of the ZR Technology package. The airplane was configured with ZR production and pre-production assemblies to define the aerodynamic configuration necessary for FAA Certification testing.

The test aircraft has been returned to baseline configuration pending completion of the first production ZR Technology kit, scheduled for installation in late spring. Final FAA Phase III Certification flying will follow immediately, including high altitude buffet boundary definition, wing anti-ice certification, etc.

First production deliveries are scheduled by next summer.

The development and FAA certification flight testing was orchestrated by Raisbeck Engineering’s Aerodynamist Nate Lachendro, who was on board for the majority of the development and certification flight testing.

Lachendro was joined by veteran Raisbeck Chief Test Pilot Pete Reynolds and the Raisbeck flight test crew in flights involving hundreds of hours of drag points and thousands of stalls.

In acclaiming both the low-speed and high-speed characteristics of the ZR package, Lachendro commented; “We wanted to come up with a system that would be the final word in increased performance for the Learjet 35/36 family”.

"We believe we are there, with an honest 10% reduction in high cruise speed drag. Other allied ZR Technology benefits include reductions in climb-time, better long-range cruise, reduced takeoff speeds and required runway, and block fuel consumption. Initial cruise altitudes, and range are also better”.

FMI: www.Raisbeck.com

Advertisement

More News

Aero-News: Quote of the Day (12.11.25)

"The owners envisioned something modern and distinctive, yet deeply meaningful. We collaborated closely to refine the flag design so it complemented the aircraft’s contours w>[...]

ANN's Daily Aero-Term (12.11.25): Nonradar Arrival

Nonradar Arrival An aircraft arriving at an airport without radar service or at an airport served by a radar facility and radar contact has not been established or has been termina>[...]

Classic Aero-TV: David Uhl and the Lofty Art of Aircraft Portraiture

From 2022 (YouTube Edition): Still Life with Verve David Uhl was born into a family of engineers and artists—a backdrop conducive to his gleaning a keen appreciation for the >[...]

Airborne-NextGen 12.09.25: Amazon Crash, China Rocket Accident, UAV Black Hawk

Also: Electra Goes Military, Miami Air Taxi, Hypersonics Lab, MagniX HeliStrom Amazon’s Prime Air drones are back in the spotlight after one of its newest MK30 delivery drone>[...]

Airborne 12.05.25: Thunderbird Ejects, Lost Air india 737, Dynon Update

Also: Trailblazing Aviator Betty Stewart, Wind Farm Scrutiny, Chatham Ban Overturned, Airbus Shares Dive A Thunderbird pilot, ID'ed alternately as Thunderbird 5 or Thunderbird 6, (>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC