Raisbeck’s Learjet 35 ZR Completes Phase II FAA Certification Flight Tests | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-06.23.25

Airborne-NextGen-06.24.25

AirborneUnlimited-06.25.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Fri, Jan 16, 2004

Raisbeck’s Learjet 35 ZR Completes Phase II FAA Certification Flight Tests

Raisbeck Engineering has completed the aerodynamic flight tests required under FAA TIA (Type Inspection Authorization), necessary to achieve it’s upcoming ZR Technology STC. RVSM qualification testing was also completed.

The FAA flight tests were conducted during the last Quarter of 2003 and completed December 4th. The flights were conducted on S/N 35-634, the same Learjet 35 which was flown over 300 hours in development flight-testing, to define the various elements of the ZR Technology package. The airplane was configured with ZR production and pre-production assemblies to define the aerodynamic configuration necessary for FAA Certification testing.

The test aircraft has been returned to baseline configuration pending completion of the first production ZR Technology kit, scheduled for installation in late spring. Final FAA Phase III Certification flying will follow immediately, including high altitude buffet boundary definition, wing anti-ice certification, etc.

First production deliveries are scheduled by next summer.

The development and FAA certification flight testing was orchestrated by Raisbeck Engineering’s Aerodynamist Nate Lachendro, who was on board for the majority of the development and certification flight testing.

Lachendro was joined by veteran Raisbeck Chief Test Pilot Pete Reynolds and the Raisbeck flight test crew in flights involving hundreds of hours of drag points and thousands of stalls.

In acclaiming both the low-speed and high-speed characteristics of the ZR package, Lachendro commented; “We wanted to come up with a system that would be the final word in increased performance for the Learjet 35/36 family”.

"We believe we are there, with an honest 10% reduction in high cruise speed drag. Other allied ZR Technology benefits include reductions in climb-time, better long-range cruise, reduced takeoff speeds and required runway, and block fuel consumption. Initial cruise altitudes, and range are also better”.

FMI: www.Raisbeck.com

Advertisement

More News

ANN's Daily Aero-Linx (06.29.25)

Aero Linx: Transport Canada We are a federal institution, leading the Transport Canada portfolio and working with our partners. Transport Canada is responsible for transportation p>[...]

ANN's Daily Aero-Term (06.29.25): Gross Navigation Error (GNE)

Gross Navigation Error (GNE) A lateral deviation from a cleared track, normally in excess of 25 Nautical Miles (NM). More stringent standards (for example, 10NM in some parts of th>[...]

Classic Aero-TV: Anticipating Futurespace - Blue Origin Visits Airventure 2017

From AirVenture 2017 (YouTube Edition): Flight-Proven Booster On Display At AirVenture… EAA AirVenture Oshkosh is known primarily as a celebration of experimental and amateu>[...]

NTSB Final Report: Cirrus SR22

Aircraft Parachute System (CAPS) Was Deployed About 293 Ft Above Ground Level, Which Was Too Low To Allow For Full Deployment Of The Parachute System Analysis: The day before the a>[...]

Airborne Affordable Flyers 06.26.25: PA18 Upgrades, ‘Delta Force’, Rhinebeck

Also: 48th Annual Air Race Classic, Hot Air Balloon Fire, FAA v Banning 100LL, Complete Remote Pilot The news Piper PA-18 Super Cub owners have been waiting for has finally arrived>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC