Final Gulfstream G250 Joins Flight-Test Program | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Tue, Jul 06, 2010

Final Gulfstream G250 Joins Flight-Test Program

Third Aircraft First Flew June 28

The third and final Gulfstream G250 test aircraft has joined the flight-test program, Gulfstream announced last week. The aircraft completed its first flight on June 28, taking off from Ben Gurion airport at 1030 local time. During the 2 hour, 56 minute flight, the aircraft reached a maximum speed of 250 knots and a top altitude of 20,000 feet.

All three aircraft that are part of the 1,300-hour flight-test campaign have now entered the flight-test program, beginning with the first, S/N 2001, on Dec. 11, 2009. Each aircraft has been assigned a specific series of tests to perform, with S/N 2001 focused on in-flight performance and handling, S/N 2002 on avionics and S/N 2003 on systems functionality and reliability.

"It's exciting to have all three test aircraft in the air," said Pres Henne, senior vice president, Programs, Engineering and Test, Gulfstream. "What's even more exciting is the response we're getting from the pilots. They've told us that the aircraft's handling qualities are excellent, rivaling those of our large-cabin aircraft. That's something we like to hear, because it means we hit the mark with our design. And we have our operators to thank for that, because they played a major role in creating this jet. This aircraft represents what they told us they wanted."

David Dagan, corporate vice president and general manager, Commercial Aircraft Group, IAI, said, "What we're witnessing today in the G250 flight-test campaign is the synergy of advanced engineering with skilled manufacturing and assembly. The hours of flight testing we are able to produce are exactly as we planned. The tests are executed exactly as we planned with the full completion of each test card, a true sign of the maturity of the design the teams brought forth."

The test aircraft have flown over 200 hours on more than 70 flights. S/N 2001 has reached its maximum speed of Mach 0.85 and altitude of 45,000 feet (13,500 m). The G250 made its longest test flight today with a duration of seven hours and one minute. Powered by twin Honeywell HTF7250G engines, the business jet is capable of traveling 3,400 nautical miles at Mach 0.80. Its initial cruise altitude is 41,000 feet.

The first G250 rolled out of the IAI manufacturing facility in Tel Aviv under its own power on Oct. 6, 2009. It is on schedule for type certification in 2011. The aircraft will be completed at the Gulfstream Mid-Cabin Center of Excellence in Dallas.

FMI: www.gulfstream.com

Advertisement

More News

Aero-News: Quote of the Day (11.18.25)

“Setting eight speed records this quickly following its August entry into service is a powerful testament to the tremendous capabilities of this aircraft. We are already seei>[...]

ANN's Daily Aero-Term (11.18.25): On-Course Indication

On-Course Indication An indication on an instrument, which provides the pilot a visual means of determining that the aircraft is located on the centerline of a given navigational t>[...]

ANN's Daily Aero-Linx (11.18.25)

Aero Linx: WW1 Aeroplanes, Inc. WORLD WAR 1 AEROPLANES was founded by Leo Opdycke in 1961 and incorporated as a federally recognized 501 (c) (3) not-for-profit corporation in 1979,>[...]

NTSB Final Report: Shoemaker Ronald R Pazmany PL-2

Pilot Reported That He Purchased The Airplane Earlier That Day Analysis: The pilot reported that he purchased the airplane earlier that day and completed a condition inspection tha>[...]

Airborne-NextGen 11.18.25: Dream Chaser Preps, Joby eTurbine, UAE Flt Test

Also: Abu Dhabi’s 1st Vertiport Network, Anduril-EDGE Partner, Vertical Permit/eVTOL Regs Sierra Space’s Dream Chaser spaceplane has cleared another round of pre-flight>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC