Russia-Based ODK To Develop Next Generation Helicopter Engine | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Fri, Mar 30, 2018

Russia-Based ODK To Develop Next Generation Helicopter Engine

Will Use Additive Manufacturing, New Materials In The Process

United Engine-Building Corporation, a part of the Rostec State Corporation, has started works on development of a prospective helicopter engine of the next generation. New construction materials and additive technologies, as well as 3D-printing, will be used in the process of development.

In addition to proven effective technologies and materials, new design visions and aviation engines production methods will be implemented in the process of development. The contractor of the project Saint-Petersburg “ODK “Klimov” is planning to implement the technologies that were already used for other ODK aircraft engine models, such as PD-14 engine for civil aircraft MC-21, a prospective engine for Su-57 fighter of the fifth generation and BK-2500M helicopter engine. New construction materials and additive technologies, as well as 3D-printing, will be used in the process of development.

“While developing new products and technologies, the Rostec State Corporation has a unique chance to use the resources of not a single company or research center but employ the united effort of all companies that are parts of the corporation to contribute to the process of development of brand new equipment for aviation industry”, Aviation Cluster Industrial Director of the Rostec State Corporation commented.

The sample engine is expected to be complete in 2021 while the power unit is supposed to be ready for serial production in 2025. The weight of the unit will be reduced by 15 per cent compared to existing competitive models while its operation costs will be 30 per cent lower.

(Image provided with Rostec news release)

FMI: rostec.ru/en

Advertisement

More News

Aero-News: Quote of the Day (11.20.25)

“This recognition was evident during the TBMOPA Annual Convention, where owners and operators clearly expressed their satisfaction with our focus on customer service, and enc>[...]

ANN's Daily Aero-Term (11.20.25): Overhead Maneuver

Overhead Maneuver A series of predetermined maneuvers prescribed for aircraft (often in formation) for entry into the visual flight rules (VFR) traffic pattern and to proceed to a >[...]

ANN's Daily Aero-Linx (11.20.25)

Aero Linx: Glenn H. Curtiss Museum The Glenn H. Curtiss Museum, bearing the name of Hammondsport’s favorite son, is located on State Route 54, one half mile south of the vill>[...]

NTSB Prelim: Just Highlander

The Flight Instructor Noticed Some Engine Roughness And Diverted Toward Westwinds Airport On November 2, 2025, about 1630 mountain standard time, an experimental amateur-built Just>[...]

Classic Aero-TV: Just Like The 'Real' Thing – Redbird/Disney’s ‘Dusty’ FlightSim

From 2014 (YouTube Edition) -- Disclaimer: No Matter What He Tells You, Tom Is Not A Certified Firefighting Pilot While at EAA AirVenture 2014, ANN News Editor, Tom Patton checked >[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC