Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-11.17.25

AirborneNextGen-
11.11.25

Airborne-Unlimited-11.12.25

Airborne-FltTraining-11.13.25

AirborneUnlimited-11.14.25

LIVE MOSAIC Town Hall (Archived): www.airborne-live.net

Sun, Nov 06, 2016

Generation Orbit Prepares For GO1 Wind Tunnel And Hot Fire Testing

Tests Will Be Conducted At AFRL's Rocket Lab At Edwards AFB

Generation Orbit Launch Services (GO) has announced the award of a SBIR Phase II Extension from the Air Force Research Laboratory, Aerospace Systems Directorate, High Speed Systems Division (AFRL/RQHV) to enable wind tunnel and integrated hot fire testing of the GO1 hypersonic testbed.

 

These efforts will further the development of the vehicle by validating aerodynamic models and demonstrating the functionality of the fully integrated GO1 rocket vehicle system. Wind tunnel testing will be accomplished at the AFRL Trisonic Gas Dynamics Facility and Mach 6 Wind Tunnel Facility at Wright-Patterson Air Force Base, OH. Integrated hot fire testing will be conducted at AFRL’s Rocket Lab test facilities at Edwards Air Force Base, CA.

“By the time these two test campaigns are complete, we’ll be well ahead of the curve in terms of our knowledge and understanding of how the vehicle hardware and software work” commented A.J. Piplica, Chief Operating Officer at GO. “The team is excited to apply what we’re learning here toward finalizing the detailed design of GO1 and pressing forward toward vehicle production and test flights in short order.”

Development of GO1 continues to progress on schedule to provide a unique flight test capability to the hypersonic and suborbital research communities. The system will enable long-duration, affordable access to high Mach number, endoatmospheric flight conditions necessary for maturing technologies, components, and subsystems relevant to high speed system architectures for both government and commercial applications.

(Image provided with Generation Orbit news release)

FMI: http://generationorbit.com

Advertisement

More News

NTSB Prelim: Funk B85C

According To The Witness, Once The Airplane Landed, It Continued To Roll In A Relatively Straight Line Until It Impacted A Tree In His Front Yard On November 4, 2025, about 12:45 e>[...]

Aero-News: Quote of the Day (11.21.25)

"In the frame-by-frame photos from the surveillance video, the left engine can be seen rotating upward from the wing, and as it detaches from the wing, a fire ignites that engulfs >[...]

ANN's Daily Aero-Term (11.21.25): Radar Required

Radar Required A term displayed on charts and approach plates and included in FDC NOTAMs to alert pilots that segments of either an instrument approach procedure or a route are not>[...]

Classic Aero-TV: ScaleBirds Seeks P-36 Replica Beta Builders

From 2023 (YouTube Edition): It’s a Small World After All… Founded in 2011 by pilot, aircraft designer and builder, and U.S. Air Force veteran Sam Watrous, Uncasville,>[...]

Airborne 11.21.25: NTSB on UPS Accident, Shutdown Protections, Enstrom Update

Also: UFC Buys Tecnams, Emirates B777-9 Buy, Allegiant Pickets, F-22 And MQ-20 The NTSB's preliminary report on the UPS Flight 2976 crash has focused on the left engine pylon's sep>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC