Everett Sets Sights On New Boeing Products | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.05.25

Airborne-NextGen-05.06.25

AirborneUnlimited-05.07.25

Airborne-Unlimited-05.01.25

AirborneUnlimited-05.02.25

Wed, Mar 28, 2012

Everett Sets Sights On New Boeing Products

Hope To Land Assembly Of 777X, 787-10 Airplanes

After a deal was struck that will have the Boeing 737 MAX built in Everett, WA, state and union leaders have set their sights on keeping assembly work on other new Boeing products in the Pacific Northwest. But it has not been determined where the planemaker will put together its planned 777X or 787-10 airplanes, let alone where it might build any clean-sheet design it introduces in the future.

Washington Governor Chris Gregoire has said often and publicly that her administration will work to keep any new Boeing assembly work in the Puget Sound region.

The Everett, WA, Herald newspaper reports that Snohomish County COO John Monroe says that there is no guarantee that Boeing will build the planned 777X there. Boeing has hinted that the follow-on 777 will have composite wings and new engines. Commercial Airplane president Jim Albaugh has said that it could be "significantly more efficient" than existing models.

Monroe said that there are a number of concerns he has about the new airplane, including a properly skilled workforce to build the large composite structures, and factory space in Everett. As Boeing ramps up production of the current 777 models, it utilizes a growing amount of the available space.

But State Commerce Department director Rogers Weed told the paper that the recent agreement between Boeing and the Machinists Union will make a strong case for building the 777X in Washington State. The 787-10 could go elsewhere, he said, based on the second production line Boeing opened in South Carolina and a plant that is doing finishing work on the Dreamliner in San Antonio, TX.

FMI: www.boeing.com, www.governor.wa.gov

Advertisement

More News

NTSB Final Report: Cessna 177B

Outboard Section Of The Right Wing And The Right Flap Separated In Flight And The Airplane Impacted A Farm Field Analysis: The pilot was approaching his destination airport under i>[...]

ANN's Daily Aero-Term (05.08.25): Final Approach Fix

Final Approach Fix The fix from which the final approach (IFR) to an airport is executed and which identifies the beginning of the final approach segment. It is designated on Gover>[...]

Aero-News: Quote of the Day (05.08.25)

"Our choice of when to respond, how to respond and on which targets to respond is a consideration that we make every time... Netanyahu also noted that anyone attacking Israel &ldqu>[...]

ANN's Daily Aero-Term (05.09.25): Estimated (EST)

Estimated (EST) When used in NOTAMs “EST” is a contraction that is used by the issuing authority only when the condition is expected to return to service prior to the e>[...]

ANN's Daily Aero-Linx (05.09.25)

Aero Linx: Coalition of Airline Pilots Associations (CAPA) The Coalition of Airline Pilots Associations (CAPA) is the world’s largest pilot trade association representing ove>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC