Restoration Of Twin Mustang Progressing In Douglas, GA | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-05.07.24

Airborne-Unlimited-05.08.24 Airborne-FlightTraining-05.09.24

Airborne-Unlimited-05.10.24

Tue, Jun 06, 2017

Restoration Of Twin Mustang Progressing In Douglas, GA

Team Is Currently Testing Electrical Circuits Preparing For Return To Flight

A rare XP-82 Twin Mustang being restored by a team led by Tom Reilly in Douglas, GA is moving closer to a return to flight.

Warbird News posted an update from the team on its website last week. According to Reilly, the team is finishing work on testing each electrical circuit. The process is a complicated one because each cockpit of the airplane has full controls, and the pilots had the ability to switch all electrical controls back and forth between cockpits. Every system, from boost pumps and lighting to electronic mixture controls, bombs, rockets and guns could be operated from either cockpit. The redundancy was necessary in part because the airplane could fly unrefueled for more than 12 hours, and the pilots could take breaks during extremely long flights.

Warbird News reports that Reilly has finally located the last two electrical components needed to restore the radio installations to their original condition.

Meanwhile, work is also continuing on the exterior of the airplane, including English-wheeling the fuselage-to-center section and the wing trailing edge and wing fairings, as well as tack riveting the cowling prior to spot welding.

The team says that testing on the hydraulic system for landing gear and flaps should be wrapped up at the end of this month. And the final rigging of the primary flight controls for the elevator and rudder is completed, along with trim tab systems. Rigging for the wings will take place once the wings are fully attached to the fuselage.

(Image from file)

FMI: Original Report

Advertisement

More News

Airborne-Flight Training 05.09.24: ERAU at AIAA, LIFT Diamond Buy, Epic A&P

Also: Vertical Flight Society, NBAA Maintenance Conference, GA Honored, AMT Scholarship For the first time, students from Embry-Riddle’s Daytona Beach, Florida, campus took t>[...]

ANN's Daily Aero-Term (05.07.24): Hazardous Weather Information

Hazardous Weather Information Summary of significant meteorological information (SIGMET/WS), convective significant meteorological information (convective SIGMET/WST), urgent pilot>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

NTSB Final Report: Cessna 150

(FAA) Inspector Observed That Both Fuel Tanks Were Intact And That Only A Minimal Amount Of Fuel Remained In Each Analysis: According to the pilot, approximately 8 miles from the d>[...]

Aero-News: Quote of the Day (05.08.24)

“Pyka’s Pelican Cargo is unlike any other UAS solution on the market for contested logistics. We assessed a number of leading capabilities and concluded that the Pelica>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC