Last-Second Glitch Forces NASA To Scrub ST5 Launch Once More | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-05.06.24

Airborne-NextGen-04.30.24

Airborne-Unlimited-05.01.24 Airborne-AffordableFlyers--05.02.24

Airborne-Unlimited-05.03.24

Wed, Mar 15, 2006

Last-Second Glitch Forces NASA To Scrub ST5 Launch Once More

Will Be Delayed "At Least" 48 Hours

NASA sources tell Aero-News a last-second problem with a locking pin forced the agency to scrub Wednesday morning's planned launch of an Orbital Sciences Pegasus XL rocket carrying three microsatellites as part of NASA's New Millennium Program.

The locking pin, part of the rocket's flight control service mechanism, failed to retract right before the Pegasus was to be launched from the program's Lockheed L-1011 jet at 6:25 am. The aircraft lifted off from Vandenberg AFB at approximately 6 am Wednesday morning, and had climbed to the launch altitude of 39,000 feet.

The L-1011 landed safely back at Vandenberg, with the Pegasus still firmly attached to beneath the aircraft's fuselage. Engineers at NASA and Orbital Sciences Corporation will now work to figure out what caused the malfunction.

NASA reports a new launch date will be established at the earliest opportunity -- pending resolution of the issue, the availability of the Western Range, and acceptable weather conditions at the Vandenberg Air Force Base, CA launch site. The delay will be at least 48 hours.

As Aero-News reported earlier this week, the Space Technology 5 mission is designed to test microsatellite technology in tracking space weather -- specifically, the strength of electrical currents in the ionosphere. Should the mission prove successful, it will pave the way for a wide range of uses for networked microsatellites.

FMI: www.nasa.gov/mission_pages/st-5/main/index.html

Advertisement

More News

ANN's Daily Aero-Term (05.09.24): Hold Procedure

Hold Procedure A predetermined maneuver which keeps aircraft within a specified airspace while awaiting further clearance from air traffic control. Also used during ground operatio>[...]

ANN's Daily Aero-Term (05.06.24): Altitude Readout

Altitude Readout An aircraft’s altitude, transmitted via the Mode C transponder feature, that is visually displayed in 100-foot increments on a radar scope having readout cap>[...]

ANN's Daily Aero-Linx (05.06.24)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

Airborne-NextGen 05.07.24: AI-Piloted F-16, AgEagle, 1st 2 WorldView Sats

Also: Skydio Chief, Uncle Sam Sues, Dash 7 magniX, OR UAS Accelerator US Secretary of the Air Force Frank Kendall was given a turn around the patch in the 'X-62A Variable In-flight>[...]

Aero-News: Quote of the Day (05.07.24)

"The need for innovation at speed and scale is greater than ever. The X-62A VISTA is a crucial platform in our efforts to develop, test and integrate AI, as well as to establish AI>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2024 Web Development & Design by Pauli Systems, LC