Aircraft Carrier John F. Kennedy Reaches 75 Percent Structural Completion | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-AffordableFlyers-06.26.25

AirborneUnlimited-06.27.25

Tue, May 08, 2018

Aircraft Carrier John F. Kennedy Reaches 75 Percent Structural Completion

New Nuclear Carrier Scheduled For Launch In 2020

The Newport News Shipbuilding division of Huntington Ingalls Industries has built 70 percent of the structures necessary to complete the nuclear-powered aircraft carrier John F. Kennedy (CVN 79), the company said recently.

Like its predecessor, the first-in-class USS Gerald R. Ford (CVN 78), Kennedy is being built with a modular construction technique where smaller sections of the ship are welded together to form larger structures called superlifts. The superlifts are pre-outfitted and hoisted into Dry Dock 12—where the ship is being built—by the company’s 1,050-metric ton gantry crane.

Shipbuilders have successfully erected 317 lifts since the ship’s keel was laid in August 2015. Kennedy is on track to be completed with 447 total lifts.

The recent 806-metric ton superlift consisted of 17 individual units and was about 171 feet long and about 92 feet wide. The structure comprises berthing areas, electrical equipment rooms and workshops and took 18 months to build.

“This superlift is in the forward part of the ship, about halfway between the bow and midship,” said Mike Butler, program director of CVN 79. “It represents one of the key build strategy changes for Kennedy: building superlifts that are larger and more complete before they are erected on the ship. We are pleased with how construction on the Kennedy is progressing, and we look forward to additional milestones as we inch closer to christening of the ship.”

Kennedy is scheduled to launch in 2020.

(Image provided with Huntington Ingalls Industries news release)

FMI: www.huntingtoningalls.com

Advertisement

More News

KidVenture Educational Activities Lineup At EAA AirVenture 2025

Youth Explore With Hands-On Builds, RC Airplanes, Flight Sims, Much More KidVenture is located just north of the EAA Aviation Museum, at Pioneer Airport, and has arranged a myriad >[...]

Aero-News: Quote of the Day (07.07.25)

“About nine decades ago, Amelia Earhart was recruited to Purdue, and the university president later worked with her to prepare an aircraft for her historic flight around the >[...]

Airborne 07.07.25: Sully v Bedford, RAF Vandalism, Discovery Moving?

Also: New Amelia Search, B737 Flap Falls Off, SUN ‘n FUN Unveiling, F-16 Record Captain Sully Sullenberger, the pilot who saved 155 people by safely landing an A320 in the Hu>[...]

Aero-News: Quote of the Day (07.08.25)

"It is critically important for North American flight safety that Temporary Flight Restriction (TFR) violations are avoided. All pilots must familiarize themselves with updates to >[...]

Airborne-NextGen 07.08.25: Joby in Dubai, Army Electra, Archer iin Abu Dhabi

Also: Hackers v Aviation, Discovery Moving?, Gogo Galileo HDX, EVE to Costa Rica Joby Aviation announced its electric air taxi successfully completed a series of VTOL wingborne tri>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC