Allegiant Air Winding Down Operations at Austin-Bergstrom International | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-07.07.25

Airborne-NextGen-07.08.25

AirborneUnlimited-07.09.25

Airborne-FlightTraining-07.10.25

AirborneUnlimited-07.11.25

Sun, Jul 28, 2024

Allegiant Air Winding Down Operations at Austin-Bergstrom International

South Terminal Slated for Demolition Amid Airport Expansion

Allegiant Air has announced the closure of its base at the Austin Bergstrom International Airport (KAUS) ahead of the upcoming closure of the southern terminal there.

Officially, the crew and aircraft base there will be terminated early next year. Allegiant reassured locals that they wouldn't leave the region of Austin, Texas hanging, intending to continue operations from the Barbara Jordan Terminal at Bergstrom. Allegiant's home at the airport has been smack dab in the center of a lawsuit for some time, which ultimately ceded operational oversight to the City of Austin. The South Terminal will likely be dismantled in early 2026, paving the way for an expanded concourse in its place.

"We appreciate the important value Allegiant Air brings to Central Texas travelers with their nonstop flight offerings," stated airport officials. "Our focus remains on providing a safe, comfortable, and authentically Austin experience for all AUS customers, regardless of their airline choice."

The bad news is that a handful of routes to smaller regional destinations will ultimately be cut from the Allegiant schedule: Flights from Austin, Texas to Bozeman, Montana; Eugene, Oregon; Louisville, Kentucky; Santa Ana, California; Omaha, Nebraska; Sioux Falls, South Dakota; and Washington Dulles International Airport will be discontinued. Those in the Austin area have a little while longer until everything wraps up and moves shop from Bergstrom, at least, with the official termination date scheduled for January 7th of 2025.

FMI: www.allegiantair.com

Advertisement

More News

Aero-News: Quote of the Day (07.11.25)

“Honored to accept this mission. Time to take over space. Let’s launch.” Source: SecTrans Sean Duffy commenting after President Donald Trump appointed U.S. Secret>[...]

ANN's Daily Aero-Term (07.11.25): Permanent Echo

Permanent Echo Radar signals reflected from fixed objects on the earth's surface; e.g., buildings, towers, terrain. Permanent echoes are distinguished from “ground clutter&rd>[...]

ANN's Daily Aero-Linx (07.11.25)

Aero Linx: European Hang Gliding and Paragliding Union (EHPU) The general aim of the EHPU is to promote and protect hang gliding and paragliding in Europe. In order to achieve this>[...]

NTSB Final Report: Schweizer SGS 2-33A

Glider Encountered A Loss Of Lift And There Was Not Sufficient Altitude To Reach The Airport Analysis: The flight instructor reported that while turning final, the glider encounter>[...]

NTSB Prelim: Aeronca 7AC

Airplane Climbed To 100 Ft Above Ground Level, At Which Time The Airplane Experienced A Total Loss Of Engine Power On May 24, 2025, at 1300 eastern daylight time, an Aeronca 7AC, N>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC