NASA's JWST Science Instruments Begin Final Super Cold Test At Goddard | Aero-News Network
Aero-News Network
RSS icon RSS feed
podcast icon MP3 podcast
Subscribe Aero-News e-mail Newsletter Subscribe

Airborne Unlimited -- Most Recent Daily Episodes

Episode Date

Airborne-Monday

Airborne-Tuesday

Airborne-Wednesday Airborne-Thursday

Airborne-Friday

Airborne On YouTube

Airborne-Unlimited-09.15.25

AirborneNextGen-
09.09.25

Airborne-Unlimited-09.10.25

Airborne-AffordableFlyers-09.11.25

AirborneUnlimited-09.12.25

Sun, Nov 01, 2015

NASA's JWST Science Instruments Begin Final Super Cold Test At Goddard

Exposed To Temperatures As Low As 40 Degrees Kelvin

An engineering team lifted and lowered the heart of NASA's James Webb Space Telescope into the giant thermal vacuum chamber at NASA's Goddard Space Flight Center in Greenbelt, Maryland. This move marks the start of the third and final cryogenic test at Goddard to prepare the Integrated Science Instrument Module (ISIM), or the “heart” of the telescope, for space.

This super cold test is vitally important for this large space telescope. Unlike a telescope you'd use in your backyard, scientists rely on remotely controlled mirrors and complex science measuring tools (instruments) to take in light from the distant universe. To do this, they must be rigorously tested on the ground to ensure they will work in space.

Webb telescope's images will reveal the first galaxies forming approximately 13.5 billion years ago. The telescope will also see through interstellar dust clouds to capture stars and planets forming in our own galaxy. At the telescope's final destination in space, one million miles away from Earth, it will operate at incredibly cold temperatures of -387 degrees Fahrenheit, or 40 degrees Kelvin. This is 260 degrees Fahrenheit colder than any place on the Earth’s surface has ever been.

To create temperatures that cold on Earth, the team uses the massive thermal vacuum chamber at Goddard called the Space Environment Simulator, or SES, that duplicates the vacuum and extreme temperatures of space. This 40-foot-tall, 27-foot-diameter cylindrical chamber eliminates almost all of the air with vacuum pumps and uses liquid nitrogen and even colder liquid helium to drop the temperature, thereby simulating the space environment.

"ISIM's final test is an exciting time for us," said Bill Ochs, Webb's Project Manager. "After this test ends, we will be able to start integrating ISIM with the rest of the telescope."

Navigating tight spaces inside the chamber while dressed in a white clean room suit to prevent contamination, Jack Marshall and other engineers readied ISIM for its super cold test. 

"After we moved ISIM into the chamber, we close the lid. Then we pump air into the chamber, so we can continue to set up inside the chamber," said Marshall. "Once everything is set, we pump out the air inside the chamber to create a vacuum. We then use liquid nitrogen and liquid helium to cool surfaces on the chamber walls and test structure, simulating the temperatures the telescope will see in space."

The several-month-long test is used to ensure all of the science instruments are ready for flight.

"Everything went smoothly and as planned," Neil Becker, mechanical engineer. "We are at the beginning of the final cryogenic test, most of the mechanical work is done."

The ISIM completed a successful acoustic test and an electromagnetic interference test a couple of months ago. A team will monitor this new grueling test for months, around the clock, to see how the instruments handle the extreme temperatures.

(Top image provided with NASA news release. Bottom image from file)

FMI: www.nasa.gov

Advertisement

More News

NTSB Final Report: Evektor-Aerotechnik A S Harmony LSA

Improper Installation Of The Fuel Line That Connected The Fuel Pump To The Four-Way Distributor Analysis: The airplane was on the final leg of a flight to reposition it to its home>[...]

ANN's Daily Aero-Term (09.15.25): Decision Altitude (DA)

Decision Altitude (DA) A specified altitude (mean sea level (MSL)) on an instrument approach procedure (ILS, GLS, vertically guided RNAV) at which the pilot must decide whether to >[...]

Aero-News: Quote of the Day (09.15.25)

“With the arrival of the second B-21 Raider, our flight test campaign gains substantial momentum. We can now expedite critical evaluations of mission systems and weapons capa>[...]

Airborne 09.12.25: Bristell Cert, Jetson ONE Delivery, GAMA Sales Report

Also: Potential Mars Biosignature, Boeing August Deliveries, JetBlue Retires Final E190, Av Safety Awareness Czech plane maker Bristell was awarded its first FAA Type Certification>[...]

Airborne 09.10.25: 1000 Hr B29 Pilot, Airplane Pile-Up, Haitian Restrictions

Also: Commercial A/C Certification, GMR Adds More Bell 429s, Helo Denial, John “Lucky” Luckadoo Flies West CAF’s Col. Mark Novak has accumulated more than 1,000 f>[...]

blog comments powered by Disqus



Advertisement

Advertisement

Podcasts

Advertisement

© 2007 - 2025 Web Development & Design by Pauli Systems, LC